Laserfiche WebLink
Segment Type Extent* Length** Description <br />equestrian. Trails will be sited to access views and points <br />of interest. An accessible barrier-free trail option could be <br />provided in the flatter southern end of the park. Some <br />equestrian trails could also be possible through the <br />creation of a public-private partnership with land owners <br />to the south of the park [approx. 10,500 If shared-use; <br />10,000 If pedestrian -only. Single-track would be additional] <br />20 Shared -Use Moon 3,400 If Improve existing rough trail to shared-use facility to the <br />Trail Mountain summit of Moon Mountain with connection from <br />Park Henderson Ave . to Pinerock Drive. Numerous <br />unauthorized trails on Moon Mountain will be eliminated <br />to protect natural resources. <br />21 Shared -Use South of 5,100 If Con·necto r trail in the area of Moon Mountain to create a <br />Trail Moon loop option between trails C8 and 22. <br />Mountain <br />22 Shared-Use Parallel to 30th 5,800 If Trail between Bloomberg Park and the Ribbon Trail. Land <br />Trail Avenue acquisition or access easements would be required along a <br />portion of this segment parallel to 30th Avenue. <br />23a Shared-Use Ribbon Trail 3,100 If Evaluate options for accommodating pedestrians and <br />Compatibility bicycles within the Ribbon Trail corridor through a parallel <br />Study trail system or upgrade of pedestrian -only trail to shared - <br />use trail. <br />23b Shared-Use Hendricks 1,700 If Evaluate options for accommodating pedestrians and <br />Compatibility Park bicycles within the corridor through a parallel trail system <br />Study or upgrade of pedestrian-only trail to shared -use trail on <br />the southern end of Hendricks Park . <br />25 Shared-Use Willamette 4,100 If Parallel to the Willamette River on the north side of the <br />Trail River railroad tracks to create a connection between two <br />existing sha r ed-use paths. This corrido r is also being <br />considered for a future shared-use path (hard -surface). <br />Access easement or acquisition required . <br />26 Pedestrian Bertelsen 5,500 If Loop trail around Sandpiper Pond and connector along A3 <br />Trail Nature Park Channel (along right-of-way) to connect to existing BLM <br />Stewart Pond trail system. <br />27 Shared -Use A3 Channel 2,600 If Shared -use trail along the levee of the City owned A3 <br />Trail Channel corridor to provide a recreational connection <br />between existing shared-use path segments. <br />28 Shared -Use Patterson 6,700 If Parallel to Patterson Slough between Garden Way and <br />Trail Slough MLK Blvd . <br />29 Shared-Use Amazon 10,200 If Along City owned south levee -top parallel to Amazon <br />Trail Diversion Creek Diversion Channel from Meadowlark Prairie to See- <br />Channel Sil Savanna at Royal Avenue. Trail would need to be sited <br />to avoid impacts to T&E species in the area including <br />Fender's blue butterfly, Kincaid 's lupine , and Bradshaw's <br />lomatium. <br />30 Running Trail Golden 9,800 If Measured two-mile running trail around perimeter of <br />Garden Park Golden Gardens Park, utilizing a portion of existing trail <br />system. <br />31 Running Trail West Bank 8,600 If Running trail parallel to existing shared -use path along the <br />Path Willamette River from Greenway Bridge to Cooping Way. <br />32 Running Trail South Bank 8,400 If Running trail parallel to existing shared -use path along the <br />Path Willamette River from Greenway Bridge to DeFazio Bridge. <br />Eugene Trails Plan -2018 Page 29