My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 1-21-20 Public Hearing
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2020
>
1-21-20
>
Agenda Packet 1-21-20 Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2020 6:03:45 PM
Creation date
1/10/2020 5:59:07 PM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Meeting
City_Council_Meeting_Date
1/21/2020
City_Council_Effective_Date
1/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />For categories where the future LOS is higher than the existing LOS, as is the case in most of the <br />developed park and facility categories shown in Table E-3, the implication for the SDC <br />methodology is that there is no available capacity in the existing system for these categories. <br />Where the reverse is true – primarily land acquisition for all park types, developed acreage for <br />metropolitan parks and botanical gardens – a portion of the existing system inventory will help <br />meet the needs of future development, which has implications for calculation of the <br />reimbursement fee (discussed further under the “SDC Cost Basis” section). <br />1.1.3 Growth Capacity Needs <br />Table E-4 provides a summary of the growth capacity needs based on the LOS analysis. It <br />begins with a determination of the total units needed to meet future/ growth needs by category, <br />based on the planned LOS (Table E-3) and the growth in equivalent population (Table E-1). <br />Table E-4 also indicates the portion of acreage and facilities that will be provided by projects <br />listed in the Project Plan and by existing system inventory (for those park categories where <br />available capacity exists). <br />Table E-4 <br />Growth Capacity Needs <br />Total Units Needed1 <br />From Project Plan <br />Additions2 <br />From Existing <br />Inventory <br />Type Unit <br />Measure <br />Total <br />Acquired Developed Acquired Developed Total <br />Acquired <br />Total <br />Developed <br />Parks Acres <br />Neighborhood 55.7 27.9 33.5 27.9 22.2 0.0 <br />Community 95.7 33.8 32.6 33.8 63.1 0.0 <br />Metropolitan 179.7 41.0 6.5 11.3 173.2 29.7 <br />Natural Area 352.1 0.0 260.0 0.0 92.1 0.0 <br />Urban Plazas 0.4 0.4 0.4 0.4 0.0 0.0 <br />Linear Parks 51.0 0.0 0.0 0.0 51.0 0.0 <br />Total Parks 734.6 103.0 333.0 73.3 401.6 29.7 <br />Recreation Trails Miles 11.3 11.7 11.3 11.7 0.0 <br />Special Facilities Sq. Feet <br />Community Centers 29,891 29,891 0.0 <br />Pools 18,663 18,663 0.0 <br />Recreation Amenities Number <br />Dog Parks 1.3 1.3 0.0 <br />Community Gardens 1.7 1.7 0.0 <br />Botanical Gardens 0.9 0.0 0.9 <br />Fields 11.2 11.2 0.0 <br />Spray Play 1.3 1.3 0.0 <br />1 Future LOS (Table E-3) x Growth Equivalent Population/1,000 (Table E-1). <br />2 From Table E-2; excludes planned units needed to increase LOS for existing development. <br />As discussed previously, the Project Plan includes improvements to increase the LOS for future <br />users relative to the current LOS in several categories. The capacity needs for growth shown in <br />Table E-4 are exclusive of the additional parks, trails and facilities that are needed to increase <br />the LOS for existing development. <br />January 21, 2020, Public Hearing – Item 1Page 106
The URL can be used to link to this page
Your browser does not support the video tag.