Laserfiche WebLink
City of Eugene SDC Methodologies - General Methodology Page 5 <br />Determine portion of system value attributable to servicing the needs of future <br />development. <br />Allocate the system value to the unit of impact (e.g., cost per unit of impervious area for <br />stormwater system). <br />Determine the service impact of specific development types (e.g., single-family dwelling, <br />motel, convenience market). <br />2.3.1 Administrative Costs <br />Administrative costs are estimated on an annually basis and include the periodic and on- <br />going direct and indirect costs associated with complying with the requirements of state <br />law and the costs of processing and administering the SDCs. An administrative charge <br />shall be incurred when one of the following occurs: <br />When a redevelopment occurs that changes the use of a building in its entirety <br />and it is determined that usage of any capital improvement is increased or there <br />is need of additional capital improvements. <br />The administrative charge will be calculated either as a percentage rate of the <br />net charge after credits for previous use, compact development adjustments, and <br />impact reductions are applied, or at a flat rate, whichever is higher, as listed in <br />the SDC fee schedule in Appendix F. <br />January 21, 2020, Public Hearing – Item 1Page 47