Laserfiche WebLink
Eugene -Springfield Area Natural Hazards Mitigation Plan <br />5. Annexes <br />C.5 Evaluation of Recommended Action Items <br />Table C-3 lists the initiatives that make up the SUB hazard mitigation plan. SUB is the <br />lead agency and funding source for these initiatives unless otherwise noted. <br />Table C-3 Hazard Mitigation Action Items <br />New <br />Existing <br />Hazard <br />Mitigation Actio <br />Timeline <br />Assets <br />Assets—lun <br />ost <br />X <br />Multi -Hazard <br />Construction of new Glenwood <br />$5M <br />2015-2022 <br />(earthquake, <br />Substation. <br />riverine flood, <br />winter storms, <br />windstorms, <br />geomagnetic <br />disturbances). <br />X <br />Multi -Hazard <br />Construction of Thurston Water <br />Pending <br />2020-2028 <br />(earthquake, <br />Treatment Plant (Pilot) <br />riverine flood, <br />winter storms, <br />windstorms, <br />geomagnetic <br />disturbances). <br />X <br />Earthquake <br />Seismic upgrade to critical <br />$7M <br />2018-2019 <br />Electric facilities. <br />X <br />Earthquake <br />Seismic retrofit of South 57'h <br />$2.4 <br />2019-2023 <br />Street Reservoirs <br />X <br />Earthquake <br />Seismic retrofit of Moe <br />$279,900 <br />2020-2024 <br />Reservoir <br />X <br />X <br />Earthquake <br />Replace 4000 feet of water <br />$910,000 <br />2019-2028 <br />distribution system pipeline <br />X <br />Multi -Hazard <br />Substation Protection Upgrades <br />$1.14M <br />2019-2028 <br />(earthquake, <br />riverine flood, <br />winter storms, <br />windstorms, <br />geomagnetic <br />disturbances). <br />X <br />Multi -Hazard <br />Electric Distribution System <br />$242,000 <br />2019 <br />(earthquake, <br />Upgrades <br />riverine flood, <br />5-37 January 2020 <br />