Laserfiche WebLink
_Eugene -Springfield Area Natural Hazards Mitigation Plan <br />5. Annexes <br />Table C-3 Hazard Mitigation Action Items <br />New <br />Existing <br />Hazard <br />Assets <br />Assets <br />Mitigated <br />Mitig <br />winter storms, <br />windstorms, <br />geomagnetic <br />disturbances). <br />Table C-4 below lists the action items contained in SUB's hazard mitigation plan and <br />identifies the priority for each item based on probable benefits, funding availability and <br />project timeline. It is not intended to act as a formal cost/benefit analysis. <br />Table C-4 Mitigation <br />Strategy <br />Priority <br />s <br />I Benefits <br />Grant <br />Can be <br />PqW <br />Ac ILIC111 <br />MiLlyated <br />Equal <br />Eligible <br />funded <br />or <br />? <br />under <br />Exceed <br />existing <br />Cost? <br />programs <br />or <br />budgets? <br />Build Glenwood <br />Earthquakes <br />High <br />High <br />Yes <br />Unsure <br />Yes <br />High <br />Substation <br />Seismic Retrofits <br />Earthquake <br />High <br />High <br />Yes <br />Yes <br />Yes <br />High <br />and Upgrades to <br />Critical Facilities: <br />SUB Water <br />Operations <br />Seismic Retrofits <br />Earthquake <br />High <br />High <br />Yes <br />Yes <br />Yes <br />High <br />and Upgrades to <br />Critical Facilities: <br />SUB Electric <br />Operations <br />Upgrade or <br />Multi -Hazard <br />High <br />High <br />Yes <br />Yes <br />Yes <br />Moderate <br />Replacement of <br />(Earthquake, <br />Electric <br />Winter Storm) <br />Distribution <br />Poles <br />Replace Aging <br />Earthquake <br />High <br />High <br />Yes <br />Unsure <br />Yes <br />High <br />Water <br />Distribution <br />Pipelines <br />5-38 January 2020 <br />