Laserfiche WebLink
Eugene -Springfield Area Natural Hazards Mitigation Plan <br />5. Annexes <br />Table C-4 Mitigation Strategy Priority <br />Mitigation <br />Hazards <br />Costs <br />Benefits <br />Benefits <br />Grant <br />Can be <br />Priority <br />Action Item <br />Mitigated <br />Equal <br />Eligible <br />funded <br />or <br />? <br />under <br />Exceed <br />existing <br />Cost? <br />programs <br />or <br />budgets? <br />Electric Voltage <br />Multi -Hazard <br />High <br />Moderate <br />Yes <br />Unsure <br />Yes <br />Moderate <br />Conversion <br />(Earthquake, <br />Project: <br />Winter <br />Glenwood, <br />Storm) <br />Hayden Bridge, <br />Mohawk <br />Secondary <br />Multi -Hazard <br />High <br />High <br />Yes <br />No <br />No <br />Moderate <br />Water Filtration <br />(Earthquake, <br />Plant <br />Wildfire, <br />Drought, <br />Winter Storm) <br />5-39 January 2020 <br />