Eugene -Springfield Area Natural Hazards Mitigation Plan <br />6. Appendices <br />Mitigation Action Item Progress Report Form (From 2014) <br />• _ - ' • • ' - I From Date: 02-2015 1 To Date: 02-2020 1 <br />#44: Backup Power <br />City of Eugene: Emergency Management, City of Springfield <br />Emergency Management <br />Kevin Holman (Eugene) and Ken Vogeney (Springfield) <br />® Project Completed ❑ Project Restructured <br />❑ Project Canceled ❑ Project delayed: <br />❑ Project On Schedule Anticipated Completion Date: _ <br />Summary of Project Progress <br />What was accomplished for this project during this reporting period (2015 <br />2020)? <br />Almost all critical facilities for both Eugene and Springfield are equipped <br />with generators. New generators are being installed with expanded fuel <br />tanks to allow for operations during prolonged power outages. In 2013 the <br />city of Eugene began developing department/division specific Continuity of <br />Operations Plans. <br />2. What obstacles, problems, or delays did the project encounter? <br />Some critical facility locations are too small or inadequate for generator <br />installation. Other locations are privately owned and either leased/rented by <br />the Cities. hi these situations, generator installation is not permitted by the <br />property owner. Continuity of Operations Planning has been steady moving <br />forward for the City of Eugene but is often delayed due to conflicting <br />projects and/or limited staff time. <br />3. If uncompleted, is the project still relevant? Should the project be changed <br />or revised? <br />This project, as is, is complete. Future Mitigation Action Items will focus on <br />specific projects to mitigate further power disruptions. <br />4. Other comments; <br />N/A <br />6-111 January 2020 <br />