My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 5303
COE
>
City of Eugene
>
Resolutions
>
2020 No. 5286-5314
>
Resolution No. 5303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2020 1:42:25 PM
Creation date
6/26/2020 1:35:11 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
6/22/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eugene -Springfield Area Natural Hazards Mitigation Plan <br />6. Appendices <br />Mitigation Action Item Progress Report Form (From 2014) <br />• _ - ' • • ' - I From Date: 02-2015 1 To Date: 02-2020 1 <br />#44: Backup Power <br />City of Eugene: Emergency Management, City of Springfield <br />Emergency Management <br />Kevin Holman (Eugene) and Ken Vogeney (Springfield) <br />® Project Completed ❑ Project Restructured <br />❑ Project Canceled ❑ Project delayed: <br />❑ Project On Schedule Anticipated Completion Date: _ <br />Summary of Project Progress <br />What was accomplished for this project during this reporting period (2015 <br />2020)? <br />Almost all critical facilities for both Eugene and Springfield are equipped <br />with generators. New generators are being installed with expanded fuel <br />tanks to allow for operations during prolonged power outages. In 2013 the <br />city of Eugene began developing department/division specific Continuity of <br />Operations Plans. <br />2. What obstacles, problems, or delays did the project encounter? <br />Some critical facility locations are too small or inadequate for generator <br />installation. Other locations are privately owned and either leased/rented by <br />the Cities. hi these situations, generator installation is not permitted by the <br />property owner. Continuity of Operations Planning has been steady moving <br />forward for the City of Eugene but is often delayed due to conflicting <br />projects and/or limited staff time. <br />3. If uncompleted, is the project still relevant? Should the project be changed <br />or revised? <br />This project, as is, is complete. Future Mitigation Action Items will focus on <br />specific projects to mitigate further power disruptions. <br />4. Other comments; <br />N/A <br />6-111 January 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.