My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 5305
COE
>
City of Eugene
>
Resolutions
>
2020 No. 5286-5314
>
Resolution No. 5305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 4:41:25 PM
Creation date
7/17/2020 4:03:02 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
7/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The SEC project list is organized into a common city-wide list and six neighborhood planning districts. <br />Geographical -based planning facilitates analysis of the unique characteristics, needs, and opportunities <br />of each area. <br />► City-wide <br />► Bethel <br />► City Central <br />► River Road/ Santa Clara <br />► Southeast <br />► Southwest <br />► Willakenzie <br />Each project is assigned a project number that correlates to the accompanying maps and to the Parks and <br />Recreation System Plan Project List. <br />The project list includes both improvements to existing parks, and acquisition and development of new parks, trails <br />and facilities. New capacity costs include improvements that increase the level of performance of existing parks <br />(to serve additional users), and new parks and facilities. For more information on how growth costs for each type <br />of project were determined, see the Parks SDC Methodology, Appendix E. <br />Note. Calculations were produced by computer spreadsheets where numbers extend beyond the decimal places <br />shown in the tables presented. These slight variations exist due to rounding and are not material. <br />
The URL can be used to link to this page
Your browser does not support the video tag.