My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 5305
COE
>
City of Eugene
>
Resolutions
>
2020 No. 5286-5314
>
Resolution No. 5305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 4:41:25 PM
Creation date
7/17/2020 4:03:02 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
7/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The adoption of the Parks and Recreation System Plan in July of 2018 established anew project list and prioritized <br />project implementation. That project list was used as the basis for the SDC project list included in this plan. The <br />subset of projects and project costs included in this plan are those needed to increase the capacity of the parks <br />and recreation system to serve the next twenty years of population growth. <br />PARKS AND RECREATION PRIORITIES <br />The Parks and Recreation System Plan identified four core principles: <br />► Care tar and make the most of what we have <br />► Serve the entire community <br />► Create more connections <br />► Build better partnerships <br />With these principles as a foundation, a set of criteria was developed to prioritize parks and recreation capital <br />projects. The criteria were applied to each project, taking into account the unique needs of each planning district <br />and triple bottom line considerations of social equity, environmental health, and economic prosperity. <br />The resulting priority ranking is an indication of the timeframefor project completion. A priority 1 rating is <br />proposed for completion in the 1-10 year time frame and a priority 2 rating for the 11-20 year time frame. The 20- <br />year planning horizon is based on data from 2015-2035. Projects with multiple ratings (i.e. 1/ 2) are proposed for <br />completion in phases due to either high dollar costs or projects that are more practically implemented over a <br />number of years, such as trails and property acquisition. <br />PROJECT COSTS <br />Costs for each of the SDC eligible projects are shown in the project list tables with a break down that shows the <br />estimated costs and percentage of costs eligible to be funded from SDC improvement fees in the "Growth %of <br />Total Project Cost" column. The costs shown on the project list fables were included in the Parks and Recreation <br />System Plan and reflect planning -level estimates. All costs are rounded and provided in 2016 dollars. <br />
The URL can be used to link to this page
Your browser does not support the video tag.