Laserfiche WebLink
7.2.4 Credit for Previous Payment or Use <br />SDC fees, including administrative charges, that have been paid are not refundable and, in the <br />case of an agreement to pay SDCs in installments, the terms of the agreement may not be <br />modified. A partial refund of SDC fees will be made or a modification of an installment <br />agreement will be allowed when an active development permit is canceled or expires without <br />being used, a change of design of an active development permit is approved that results in a <br />less intense use of the property, or property previously developed as a manufactured home <br />park is partitioned and redeveloped. No portion of the administrative charges will be refunded, <br />and additional review fees may be imposed to cover the cost of calculating and processing the <br />partial refund. <br />Credits for other types of previous payment or use may, however, be provided. In calculating <br />the credits given under this section, the City Engineer shall apply credit for previous payment or <br />use only to developments (e.g. structure, impervious area) for which the previous use, including <br />that for which developments have been demolished, or payment can be verified and for which a <br />credit has not been previously given. The burden of proof is on the applicant to provide <br />adequate documentation (e.g. tax records, utility billing / water usage records, building permit <br />records). Credits for previous payment or use are provided in the following manner: <br />When redevelopment occurs that does not change the use of a building in its entirety, <br />the credit will be based on the most previous verifiable use; or <br />• When an entire building is demolished or when redevelopment occurs that will change <br />the use of a building in its entirety, the credit for previous use will be based on the <br />previous most intense verifiable use per system. In this case, the credit calculation will <br />be performed independently for each system which may result in different periods of the <br />use of the site being the basis of comparison. <br />7.2.5 City Cost of Construction Credit <br />In calculating the credits given under section 7.2.1 and 7.2.2, the City Engineer shall estimate <br />the cost of the capital improvement based upon what the City would pay were it to construct <br />such improvements. <br />7.2.6 Revenue Collection for Equivalent Assessment or Special Benefit <br />Credit <br />When an equivalent assessment or a special benefit assessment is collected when property <br />connects to a public improvement for which the City has granted a credit under 7.2.2 above, the <br />revenue collected (net of the costs of collection) shall be deposited in the SDC fund for the <br />system to which connection was made and for which the credit was given unless the SDC fund <br />has been reimbursed for the credit from other City funds. If the SDC fund has been reimbursed <br />in advance from other City funds, the revenue collected will be deposited to the City fund which <br />reimbursed the SDC fund. <br />7.3 Compact Development Adjustments <br />7.3.1 Transportation System SDC Compact Development Adjustments <br />City of Eugene SDC Methodologies - General Methodology <br />Page 17 <br />