My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-20-26
COE
>
City of Eugene
>
Administrative Orders
>
2020
>
Admin Order 58-20-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 11:00:30 AM
Creation date
8/25/2020 10:55:01 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 Eugene Wastewater Master Plan Chapter 7: Major System Expansion 52 <br />Table 7-1: Summary of Costs for Proposed Capital Improvements to Wastewater System <br />(Estimated Costs from Tables 7-2 Through 7-5) <br />Improvement Area Description Total New Capacity Costs1 <br />1. SW – West 11th/Crow Road (Map 7-B) a. 16672 to B-01 $621,315 b. B-02 to B-01 $559,396 c. B-03 to B-01 $628,600 <br />2. SW – Willow Creek/West 18th (Map 7-C) a. C-04 to 4348 $401,957 <br />3. SW – Bailey Hill/Gimpl Hill (Map 7-D) a. PS-D-55, PS-D-55 to D-05, and D-05 to 2324 $1,550,044 <br />4. SI – North of East Enid Road (Map 7-E) a. PS-E-06, E-07 to PS-E-06, and E-08 to PS-E-06 $3,432,392 b. E-09 to E-08 and E-11 to E-08 $1,033,029 c. E-16 to PS-E-12 and PS-E-12 $3,006,912 <br />5. SI – South of East Enid Road (Map 7-E) a. E-19 to 5706 $526,109 <br />6. SI – South of Beltline Highway (Map 7-F) a. F-21 to 15929 $361,903 <br />7. WN – North Delta Highway (Map 7-G) a. PS-G-22 and PS-G-22 to G-25 $1,004,431 b. G-25 to 16814 $207,341 <br />8. WN – Coburg Road/County Farm (Map 7-H) a. PS-H-26 and PS-H-26 to 17007 $1,014,379 b. PS-H-27 and PS-H-27 to 17015 $1,168,176 <br />9. SI/BN – Clear Lake Road (Map 7-I) a. I-30 to PS-I-32, I-33 to PS-I-32, and PS-I-32 $5,457,149 b. I-39 to I-34 $1,778,486 c. I-37 to I-39 and I-40 to I-39 $1,047,655 d. I-41 to 5927, I-42 to W Irwin PS, W Irwin PS, and I-43 to 13369 $2,420,126 <br />Total $26,219,399 <br />1 All costs shown are in 2019 dollars and include 35% for engineering and administration <br />PRELIMINARY DESIGN AND COST ESTIMATED BY AREA <br />The major wastewater collection system improvements which may impact the City of Eugene Capital Improvement Program in the next 20 years are in the following areas (see Map 7-A for an overview):
The URL can be used to link to this page
Your browser does not support the video tag.