My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-20-26
COE
>
City of Eugene
>
Administrative Orders
>
2020
>
Admin Order 58-20-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 11:00:30 AM
Creation date
8/25/2020 10:55:01 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 Eugene Wastewater Master Plan Chapter 7: Major System Expansion 54 <br />have been constructed, and Map 7-H indicates future needs. As planned in 1992, two new pump <br />stations will be required to fully service this basin. <br />Clear Lake Road (SI/BN) <br />In 2017, the Clear Lake Expansion added 924 acres of land to Eugene’s Urban Growth Boundary near <br />Clear Lake Road. This expansion will add sub-basins to Basins SI and BN. <br />The service plan for this area is on map 7-I. As much land as cover will allow will be drained south into <br />pipes that lead to the West Irwin Pump Station. The remainder of the lots will be drained North into Enid <br />Pump Station, which will need to be relocated and upsized. <br />Table 7-2: Proposed Wastewater Capital Improvements for South West Eugene <br />Location Preliminary Design Information <br />Manhole <br />Basin/No. <br />Capacity <br />(CFS) <br />Pipe Size <br />(Inches) <br />Invert <br />Elevation <br />Slope <br />(Ft./ft.) <br />Length <br />(Ft.) <br />Average <br />Depth (Ft.) <br />Estimated <br />Cost1 <br />SW - West 11th/Crow Road (Map 7-B) <br />From 16672 <br />To B-01 3.76 15 379.7 <br />383.3 0.002 1570 23 $621,3102 <br />From B-01 <br />To B-02 1.42 10 383.3 <br />387.5 0.0025 1540 21 $559,4002 <br />From B-01 <br />To B-03 1.42 10 383.3 <br />388.8 0.0025 2015 17 $625,5602 <br />SW - Willow Creek/West 18th (Map 7-C) <br />From C-04 <br />To 4348 2.70 10 389.7 <br />406.7 0.009 1830 10 $390,9402 <br />SW - Bailey Hill / Gimpl Hill (Map 7-D) <br />PS-SW1 0.8 MGD 430 N/A N/A 10 $910,570 <br />From PS-SW1 <br />To D-05 <br /> 6” force <br />main <br />430 <br />496.0 N/A 1450 3 $129,910 <br />From 2324 <br />To D-05 2.43 8 437.9 <br />496.0 0.024 2400 8 $505,9802 <br />1 All costs shown are in 2019 dollars and include 35% for engineering and administration <br />2 Assumed to be constructed in existing roads. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.