Laserfiche WebLink
2020 Eugene Wastewater Master Plan Chapter 7: Major System Expansion 55 <br />Table 7-3: Proposed Wastewater Capital Improvements for Hwy 99 Industrial Basin (North) <br />Location Preliminary Design Information <br />Manhole <br />Basin/No. <br />Capacity <br />(CFS) <br />Pipe Size <br />(Inches) <br />Invert <br />Elevation <br />Slope <br />(Ft./ft.) <br />Length <br />(Ft.) <br />Average <br />Depth (Ft.) <br />Est. Const. <br />Cost 1 <br />SI - North of East Enid Road (Map 7-E) <br />PS-E-06 (lift <br />station located at <br />the end of Action <br />Way) <br />4.8MGD <br /> <br />351.9 N/A N/A 21 $2,731,720 <br />From PS-E-06 <br />To 16103 7.48 18 367.5 <br />367.0 0.003 150 6 $34,910 <br />From PS-E-06 <br />To E-07 1.56 10 351.9 <br />355.2 0.003 1000 17 $255,420 <br />From PS-E-06 <br />To E-08 6.11 18 351.9 <br />354.5 0.002 1175 19 $398,220 <br />From E-08 <br />To E-09 1.42 10 354.5 <br />359.1 0.0025 1650 16 $421,440 <br />From E-08 <br />To E-10 6.11 18 354.5 <br />357.2 0.002 1200 15 $346,320 <br />From E-10 <br />To E-11 4.60 15 357.2 <br />361.1 0.003 1200 10 $217,930 <br />PS-E-12 (lift <br />station located <br />north of Awbrey <br />Lane) <br />2.9MGD <br /> <br />345 <br /> <br /> 19 $1,669,390 <br />From PS-E-12 <br />To E-11 <br /> 12” force <br />main <br />345 <br />361.1 N/A 2360 4 $239,940 <br />From PS-E-12 <br />To E-13 1.56 10 345 <br />350.4 0.003 1640 14 $353,450 <br />From PS-E-12 <br />To E-14 3.76 15 345 <br />347.3 0.002 1000 17 $270,290 <br />From E-14 <br />To E-15 2.07 12 347.3 <br />350.0 0.002 1200 13 $265,280 <br />From E-15 <br />To E-16 1.42 10 350.0 <br />352.2 0.0025 800 9 $139,320 <br />1 All costs shown are in 2019 dollars and include 35% for engineering and administration <br /> <br />