My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-20-26
COE
>
City of Eugene
>
Administrative Orders
>
2020
>
Admin Order 58-20-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 11:00:30 AM
Creation date
8/25/2020 10:55:01 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 Eugene Wastewater Master Plan Chapter 7: Major System Expansion 57 <br /> <br />Table 7-5: Proposed Wastewater Capital Improvements for Willakenzie Area <br />Location Preliminary Design Information <br />Manhole <br />Basin/No. <br />Capacity <br />(CFS) <br />Pipe Size <br />(Inches) <br />Invert <br />Elevation <br />Slope <br />(Ft./ft.) <br />Length <br />(Ft.) <br />Average <br />Depth (Ft.) <br />Est. Const. <br />Cost1 <br />WN - North Delta Highway (Map 7-G) <br />PS-G-22 (in the <br />northwest corner <br />of the basin) <br />0.3MGD <br /> <br />380 N/A N/A 8 $758,810 <br />From PS-G-22 <br />To G-23 <br /> 6” Force <br />Main <br />383 <br />396.1 N/A 580 4 $33,450 <br />From G-23 <br />To G-24 1.0 8 3 396.1 <br />393.1 0.004 680 5 $74,360 <br />From G-24 <br />To G-25 1.0 8 3 389.9 0.004 750 10 $131,430 <br />From G-25 <br />To 16814 1.27 10 389.9 <br />388.0 0.002 775 17 $197,900 <br />WN - Coburg Road/County Farm (Map 7-H) <br />PS-H-26 0.4MGD 396 N/A N/A 18 $910,570 <br />From PS-H-26 <br />To 17007 <br /> 6” Force <br />Main N/A N/A 1,160 4 $103,8102 <br />PS-H-27 0.3MGD 404 N/A N/A 11 $758,810 <br />From PS-H-27 <br />To H-28 <br /> 6” Force <br />Main N/A N/A 1,300 4 $74,970 <br />From H-28 <br />To 17015 1.0 8 3 414.4 <br />407.7 0.004 1575 7 $332,0602 <br />1 All costs shown are in 2019 dollars and include 35% for engineering and administration <br />2 Assumed to be constructed in existing roads. <br />3 8-inch lines required for the pump station <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.