My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-20-26
COE
>
City of Eugene
>
Administrative Orders
>
2020
>
Admin Order 58-20-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2020 11:00:30 AM
Creation date
8/25/2020 10:55:01 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 Eugene Wastewater Master Plan Chapter 7: Major System Expansion 56 <br />Table 7-4: Proposed Wastewater Capital Improvements for Hwy 99 Industrial Area Basin (South) <br />Location Preliminary Design Information <br />Manhole <br />Basin/No. <br />Capacity <br />(CFS) <br />Pipe Size <br />(Inches) <br />Invert <br />Elevation <br />Slope <br />(Ft./ft.) <br />Length <br />(Ft.) <br />Average <br />Depth (Ft.) <br />Est. Const. <br />Cost1 <br />SI - South of East Enid Road (Map 7-E) <br />From 5706 <br />To E-17 4.2 15 363.5 <br />365.7 0.0025 800 10 $145,240 <br />From E-17 <br />To E-18 2.32 12 365.7 <br />368.9 0.0025 1100 10 $191,830 <br />From E-18 <br />To E-19 1.42 10 368.9 <br />371.1 0.0025 800 10 $139,320 <br />SI - South of Beltline Highway (Map 7-F) <br />From 15929 <br />To F-20 2.32 12 371.2 <br />373.4 0.0025 800 16 $259,8202 <br />From F-20 <br />To F-21 1.42 10 373.4 <br />374.5 0.0025 400 15 $105,0202 <br />1 All costs shown are in 2019 dollars and include 35% for engineering and administration <br />2 Assumed to be constructed in existing roads. <br />
The URL can be used to link to this page
Your browser does not support the video tag.