Laserfiche WebLink
2020 Eugene Wastewater Master Plan Chapter 7: Major System Expansion 56 <br />Table 7-4: Proposed Wastewater Capital Improvements for Hwy 99 Industrial Area Basin (South) <br />Location Preliminary Design Information <br />Manhole <br />Basin/No. <br />Capacity <br />(CFS) <br />Pipe Size <br />(Inches) <br />Invert <br />Elevation <br />Slope <br />(Ft./ft.) <br />Length <br />(Ft.) <br />Average <br />Depth (Ft.) <br />Est. Const. <br />Cost1 <br />SI - South of East Enid Road (Map 7-E) <br />From 5706 <br />To E-17 4.2 15 363.5 <br />365.7 0.0025 800 10 $145,240 <br />From E-17 <br />To E-18 2.32 12 365.7 <br />368.9 0.0025 1100 10 $191,830 <br />From E-18 <br />To E-19 1.42 10 368.9 <br />371.1 0.0025 800 10 $139,320 <br />SI - South of Beltline Highway (Map 7-F) <br />From 15929 <br />To F-20 2.32 12 371.2 <br />373.4 0.0025 800 16 $259,8202 <br />From F-20 <br />To F-21 1.42 10 373.4 <br />374.5 0.0025 400 15 $105,0202 <br />1 All costs shown are in 2019 dollars and include 35% for engineering and administration <br />2 Assumed to be constructed in existing roads. <br />