Laserfiche WebLink
Teri Higgins  <br />June 30, 2016  <br />Page 6  <br />Table 2. Eugene Sewer Pipe Lengths (in feet) by Material and Diameter (inches)  <br />8" or less  10"‐12"  15"‐20"  21"‐30"  36"‐48"  54"‐72"  <br />Concrete ‐ assumed  <br />bell & spigot 1,196,312 154,417   125,096  128,049 81,383   37,904   <br />PVC/Truss 1,391,462 82,639   25,834  8,575   <br />Continuously Lined  <br />between Manholes ‐  <br />Various Host Pipes,  <br />includes HDPE 302,756   54,595   17,979  4,935   1,016   <br />Transite 9,365   6,575   3,772   <br />Cast Iron/Steel 2,268  499   176   125  21   <br />Clay 12,464  686   175   <br />Total  3,649,078  <br />Table 3 shows the expected number of repairs when the sewer system is subjected to wave propagation  <br />(shaking). This is not a precise number with a range in the results of minus 50% to plus 100%.  Repairs  <br />for areas subjected to liquefaction are not included in this table. The large majority of the repairs are in  <br />small diameter concrete and PVC/Truss pipe, driven by the large footage in these categories. These  <br />repairs would be randomly distributed across the system.   <br />Table 3. Expected Gravity Pipe Repairs Due to Wave Propagation (PGV)  <br /> Pipe Type  K  <br />8" or  <br />less  <br />10"‐ <br />12"  <br />15"‐ <br />20"  <br />21"‐ <br />30"  <br />36"‐ <br />48"  <br />54"‐ <br />72"   Total <br />Concrete ‐ assumed bell &  <br />spigot  0.7  10  1  1  1  1  0  14  <br />PVC/Truss 0.7  11  1  0  0  0  0  12  <br />Continuously Lined between  <br />Manholes ‐ Various Host  <br />Pipes, includes HDPE  0.4  2  0  0  0  0  0  2  <br />Transite 0.5 0 0 0  0  0  0 0  <br />Cast Iron/Steel 1.0  0  0  0  0  0  0  0  <br />Clay 1.0 0 0 0  0  0  0 0  <br /> Total 23  2  1  1  1  0 29  <br />2020 Eugene Wastewater Master Plan Appendix A-6