Laserfiche WebLink
FACILITY REQUIREMENTS <br />Taxiway Connector Locations <br />»Runway 16R-34L ROT values and taxiway exit locations – REDIM analysis revealed the current <br />locations of runway taxiway exits do not allow aircraft to meet the 50 second industry standard <br />for runway occupancy time. Alternatives will reconfigure taxiway exits to meet REDIM modeled <br />optimal locations. <br />»Taxiway A7 - Taxiway A7 captures no aircraft landing on Runway 16R or Runway 34L. This <br />Taxiway should be removed. <br />»Taxiway A8 – Taxiway A8 is operationally useful as a bypass taxiway but does not meet FAA <br />design standards as such. Taxiway A8 should be realigned to meet FAA bypass taxiway design <br />standards. <br /> <br />Navigational Aids and Lighting <br />»Runway 34L VASI – Replace with LED lit PAPI system during future upgrades. <br />»Airport rotating beacon – Replace and relocate to a more secured and remote area within <br />planning period. <br />»Segmented circle – Construct landing strip and traffic pattern indicators. <br /> <br />Passenger Terminal <br />»Airline space – Expand ticketing, outbound baggage, airline administration space, and departure <br />lounges within planning period. <br />»TSA space – Expand TSA checked baggage screening facilities within planning period to <br />accommodate forecast airline ticketing area growth. <br />»Public circulation space – Expand landside and airside public circulation space within planning <br />period to accommodate forecast airline growth. <br /> <br />Terminal Gates and Apron <br />»Aircraft parking positions – Provide 5 additional parking positions and appropriate pavement <br />areas for growth in commercial aircraft. <br />»Heavy Aircraft Parking – Increase the capacity for parking heavy aircraft in the terminal area. <br /> <br />Landside <br />»Inner Terminal Curb Roadway – Under current operating conditions, the inner curb roadway <br />does not have adequate capacity or level of service through the planning period. However, <br />implementing the enforcement of “active loading/unloading only” time limitations along with <br />other minor operational adjustments to reduce the existing high dwell times would result in <br />sufficient capacity and a high level of service throughout the planning period. Additionally, the <br />location of the rental car ready lot requires rental customers to leave the terminal environment by <br />driving on the inner curb roadway. This unnecessarily lowers capacity of the inner curb road. <br />»Short-Term Parking – An additional 45 parking spaces will be needed through the planning <br />period. <br />EUGENE AIRPORT MASTER PLAN 3-70 <br /> <br />