Laserfiche WebLink
FACILITY REQUIREMENTS <br />»Long-Term Parking – An additional 480 parking spaces will be needed through the planning <br />period. <br />»Employee Parking – The tenant employee parking lot is already effectively full and the <br />administrative building parking lot has adequate parking throughout the planning period. The <br />tenant parking lot will need additional spaces throughout the planning period. <br />»Rental Car Parking – The rental car storage space deficit grows to a combined total of almost <br />200 spaces. Most of these are service area storage spaces. The ready-return lot needs to be <br />expanded by 36 spaces and the service area needs to grow by 76 percent, or 161 spaces. The land <br />area required to provide the additional spaces in the service area reaches approximately one acre, <br />dependent upon the layout. <br /> <br />General Aviation Facilities <br />»General aviation apron – Define plan for consolidating general aviation facilities. Specific areas <br />include: <br />Lane Aviation – Relocate away from hot spot area congested with training, cargo, and <br />commercial activity. <br />North Ramp – Relocate or improve configuration. Remove light poles and relocate to <br />edge of apron. Consider proper location and configuration of existing heavy pads which <br />are constrained nearby obstructions. <br />South Ramp – Correct trench drain issue which jeopardizes safety and creates inflexibility <br />of apron use. Heavy pad does not have adequate weight capacity. Reconfigure VSR. <br />»General aviation hangars – Provide adequate space for growth in T-hangars, small box hangars, <br />and large corporate hangars. Consolidate general aviation hangars in location which avoids <br />conflict with commercial airline operations. <br />»General aviation tie-down spaces – Consolidate along with general aviation apron and <br />associated facilities. <br /> <br />Air Cargo <br />»Air cargo SIDA markings – Evaluate the potential of reducing SIDA markings to area necessary <br />to accommodate cargo aircraft. <br />»Charter operations - Expand Taxiway L and J to allow easy access for TDG 4 and 5 aircraft. <br /> <br />Support Facilities <br />»Aircraft Rescue and Firefighting <br />Program ARFF vehicle purchases be spread out allowing gradual fleet replacement over <br />time. ARFF-1 will require replacement by 2024. ARFF-2 will require replacement in the <br />near-term (currently in budget.) <br />»Fuel storage – Relocate to inside security fence with allowances for airside access. <br />»Deicing – Relocate solid and liquid deicing agent storage along with fuel facilities as necessary. <br />Preserve space for future deicing facilities during alternatives development. <br />EUGENE AIRPORT MASTER PLAN 3-71 <br /> <br />