My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIRPORT DEVELOPMENT ALTERNATIVES <br />area. This location suits the needs of development over the planning period and increases safety and <br />operational efficiency by creating simple and secure landside/airside access for fuel delivery trucks and <br />aircraft fueling trucks used by the existing Fixed Base Operator. <br />Preferred development for airport airside maintenance, including snow removal equipment and <br />maintenance employee spaces, is within the existing facility location area. Future development space is <br />preserved for airside maintenance buildings east and west of the existing buildings to allow campus style <br />development into the future. Landside maintenance employee space is accounted for within the airside <br />maintenance campus area, but equipment and materials storage structures are preferred to be located on <br />the south side of the airport. For this reason, the landside equipment and materials storage preferred <br />building location is adjacent to the preferred fuel storage facility, on the east side of the intersection of <br />Boeing Drive and Airport Road. <br /> Ultimate Airport Land Use Vision <br />The ultimate land use vision for the airport, depicted in Figure 4-27, shows a potential development path <br />which organizes the variety of airport land uses according to the Aland use vision. This <br />graphic serves as a reference point while the Airport continues development over the planning period and <br />beyond. <br />The chapter following this section will assess and describe a financially feasible Implementation Plan to <br />achieve the preferred development future. The Implementation Plan covers timing and phasing of <br />individual projects required to implement the preferred development future and updates the <br />Capital Improvement Program (CIP) accordingly. Implementation will be based upon the need, cost, and <br />funding feasibility of each element. This chapter of the master plan will then become the basis to update <br />the Airport Layout Plan for FAA approval. This will describe each element of the Airport Layout Plan which <br />serves as a guiding document for future airport development and FAA funding. <br />EUGENE AIRPORT MASTER PLAN 4-63 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.