Laserfiche WebLink
IMPLEMENTATION AND FINANCING PLAN <br />come from the same bond as Ticketing, Airline Ticket Offices, and Outbound Baggage Area <br />Expansion. The $23.7 million bond estimate includes both terminal building projects. <br />29. New Terminal Concourse Apron <br />Terminal area apron space must be constructed to serve ADG III aircraft using the new expanded <br />concourse gates. In order to do so, a large section of the North Ramp is required to be reconstructed, <br />eliminating two old and misaligned heavy pad parking positions, on-airfield ramp lighting, and <br />underutilized aircraft tie-downs. The design process for this new concourse also needs to consider <br />retention of dual-flow access capabilities for general aviation aircraft accessing the North Hangar facilities. <br />Additional pavement will be to be rehabilitated and/or constructed around the newly expanded outbound <br />baggage handling area to allow Ground Service Vehicle (GSE) movement and storage. Funding for this <br />project is programmed in the recommended CIP update to be from federal AIP entitlement funds, <br />discretionary funds, and the required local match. <br /> <br />EUGENE AIRPORT MASTER PLAN 5-34 <br /> <br />