My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPLEMENTATION AND FINANCING PLAN <br />Project Title: <br />Fuel Storage Facility: Phase II - Construction and Decommission of Old Facility <br />Project Description: <br />Relocate fuel storage facilities in new location on Boeing Drive southeast of existing hangars. Expand Jet A fuel capacity with <br />additional 27,500 gallons of storage. Decommission and remove all elements of existing fuel storage facility at Lockheed Drive. <br />Project Trigger: <br />The operational and security need for this project already exists. Actions should be taken immediately to pursue and secure <br />private funding. <br />Project Justification: <br />Existing fuel storage tanks are not located within a secure fenced area of the airport. The existing location on Lockheed Drive <br />(public roadway) requires aircraft fuel trucks to drive on public roads without proper licensing. An additional 27,500 gallons of <br />storage is required for Jet A fuel storage needs. Decommissioned fuel facilities must be removed for airport safety/security and <br />environmental purposes according to EPA guidelines. The new fuel storage facility is a prime opportunity for private funding. <br />Project Schedule: <br />Procurement StartDesign StartConstruction StartConstruction End <br />2018 - Q32018 - Q32019 - Q32020 - Q3 <br />Budgeted Costs: <br />Planning/EnvironmentalA&E DesignConstructionProject Management <br />$68,800$344,000$3,440,000$275,200 <br />Equipment/Miscellaneous Budgeted Project Cost (2017 $)Budgeted Project Cost (Escalated) <br />$0$4,128,000$4,335,000 <br />Project Location: <br /> <br /> <br />EUGENE AIRPORT MASTER PLAN 5-37 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.