Laserfiche WebLink
IMPLEMENTATION AND FINANCING PLAN <br />Project Title: <br />Advanced Terminal Planning Study <br />Project Description: <br />Conduct an advanced terminal planning study to define the critical path toward new concourse build out. Consideration should <br />be given to impacts on all aircraft parking positions and passenger boarding bridge locations. <br />Project Trigger: <br />One year prior to beginning design of the new terminal concourse and ticketing/outbound baggage expansion. This project <br />enables design of the terminal expansions and additions. <br />Project Justification: <br />This project will serve as the framework for architectural and engineering design of terminal concourse and ticketing expansions <br />over the planning period. The objectives of this study are to precisely determine building envelop limitations, apron layout, and <br />the architectural preferences for the building. Concourse A passenger boarding bridge locations should also be reviewed for <br />impacts and necessary alterations. <br />Project Schedule: <br />Procurement StartDesign StartConstruction StartConstruction End <br />2019 - Q1--2019 - Q4 <br />Budgeted Costs: <br />Planning/EnvironmentalA&E DesignConstructionProject Management <br />$250,000$0$0$0 <br />Equipment/Miscellaneous Budgeted Project Cost (2017 $)Budgeted Project Cost (Escalated) <br />$0$250,000$263,000 <br />Project Location: <br /> <br /> <br />EUGENE AIRPORT MASTER PLAN 5-42 <br /> <br />