My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPLEMENTATION AND FINANCING PLAN <br />Project Title: <br />Advanced Terminal Planning Study <br />Project Description: <br />Conduct an advanced terminal planning study to define the critical path toward new concourse build out. Consideration should <br />be given to impacts on all aircraft parking positions and passenger boarding bridge locations. <br />Project Trigger: <br />One year prior to beginning design of the new terminal concourse and ticketing/outbound baggage expansion. This project <br />enables design of the terminal expansions and additions. <br />Project Justification: <br />This project will serve as the framework for architectural and engineering design of terminal concourse and ticketing expansions <br />over the planning period. The objectives of this study are to precisely determine building envelop limitations, apron layout, and <br />the architectural preferences for the building. Concourse A passenger boarding bridge locations should also be reviewed for <br />impacts and necessary alterations. <br />Project Schedule: <br />Procurement StartDesign StartConstruction StartConstruction End <br />2019 - Q1--2019 - Q4 <br />Budgeted Costs: <br />Planning/EnvironmentalA&E DesignConstructionProject Management <br />$250,000$0$0$0 <br />Equipment/Miscellaneous Budgeted Project Cost (2017 $)Budgeted Project Cost (Escalated) <br />$0$250,000$263,000 <br />Project Location: <br /> <br /> <br />EUGENE AIRPORT MASTER PLAN 5-42 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.