Laserfiche WebLink
IMPLEMENTATION AND FINANCING PLAN <br />Project Title: <br />Stormwater Master Plan - Basins B and C <br />Project Description: <br />This project performs a complete survey of the Basins B and C areas to identify existing conditions related to stormwater <br />drainage and buried utilities. <br />Project Trigger: <br />Project construction requires a complete survey of the airport to identify stormwater drainage flows, existence of buried <br />infrastructure, and develop a plan to manage those resources as the airport develops. <br />Project Justification: <br />Project construction in the Basin B area has brought attention to the need for complete survey of the airport to identify <br />stormwater drainage flows, existence of buried infrastructure, and develop a plan to manage those resources as the airport <br />develops. Having a clear understanding of stormwater drainage and infrastructure will ensure airport projects can manage <br />those resources, providing cost savings as construction the Basin B area occurs. <br />Project Schedule: <br />Procurement StartDesign StartConstruction StartConstruction End <br />2019 - Q1--2020 - Q1 <br />Budgeted Costs: <br />Planning/EnvironmentalA&E DesignConstructionProject Management <br />$200,000$0$0$0 <br />Equipment/Miscellaneous Budgeted Project Cost (2017 $)Budgeted Project Cost (Escalated) <br />$0$200,000$215,000 <br />Project Location: <br /> <br /> <br />EUGENE AIRPORT MASTER PLAN 5-43 <br /> <br />