My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPLEMENTATION AND FINANCING PLAN <br />Project Title: <br />Runway 34R-16L Rehabilitation: Phase II - Construction <br />Project Description: <br />Perform routine rehabilitation maintenance of Runway 16L-34R. <br />Project Trigger: <br />The Pavement Management Plan drives airfield maintenance project timing. <br />Project Justification: <br />Runway 16L-34R requires regular maintenance to maintain a safe pavement surface for arriving and departing aircraft. This <br />runway typically serves general aviation aircraft but is necessary to allow commercial operations when the primary runway is <br />unavailable. <br />Project Schedule: <br />Procurement StartDesign StartConstruction StartConstruction End <br />2020 - Q12020 - Q22021 - Q22021 - Q4 <br />Budgeted Costs: <br />Planning/EnvironmentalA&E DesignConstructionProject Management <br />$179,760$898,800$8,988,000$719,040 <br />Equipment/Miscellaneous Budgeted Project Cost (2017 $)Budgeted Project Cost (Escalated) <br />$0$10,785,600$11,865,000 <br />Project Location: <br /> <br /> <br />EUGENE AIRPORT MASTER PLAN 5-46 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.