My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INVENTORY OF EXISTING CONDITIONS <br />was upgraded to handle new jet aircraft which were increasing in use. In the early 1980s, Eugene Airport <br />experienced a rapid increase in activity levels. In response to this increase, an airport improvement <br />program was put into place which included the expansion and modernization of the new terminal, a new <br />air traffic control tower facility, a new automobile parking facility, and an extensive landside landscaping <br />project. The improvement program greatly enhanced airport facilities and, in turn, increased safety, <br />capacity, operational efficiency, and the overall image of the Airport. <br /> <br />Over the past two decades, Mahlon Sweet Field has continued to develop and grow. Some of the most <br />notable growth experienced includes the construction of a secondary 6,000 foot long parallel runway, an <br />instrument landing system (ILS) upgrade for Runway 16R-34L from a Category I to a Category III, and the <br />installation of an ILS system for Runway 16L-34R. Additionally, Mahlon Sweet Field is currently undergoing <br />a $16.8 million dollar terminal expansion. Once completed, this expansion will add close to 13,000 square <br />feet to the existing facility, along with a renovation to the existing space. <br /> <br />Figure 1-1 details the Airport’s history from inception to today. Included is an account of the various <br />airlines that began commercial service at Eugene. <br /> <br /> <br /> <br />EUGENE AIRPORT MASTER PLAN 1-2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.