Laserfiche WebLink
IMPLEMENTATION AND FINANCING PLAN <br />Project Title: <br />New Rotating Beacon and Removal of Old Beacon <br />Project Description: <br />Construct a new rotating beacon in a safe and secure location. Remove the old rotating beacon. This project includes planning <br />analysis, design, and construction of the facility. <br />Project Trigger: <br />This project is needed as soon as practical and is an enabling project for landside road/parking development. <br />Project Justification: <br />The existing rotating beacon is located on the unsecure side of the fence in a location more suited to landside related functions. <br />Prior to locating the new rotating beacon, a study should be performed to determine the optimal location within the security <br />fence. This study should include analysis of the Air Traffic Control Tower ability to accommodate a rooftop beacon. <br />Project Schedule: <br />Procurement StartDesign StartConstruction StartConstruction End <br />2020 - Q32020 - Q42021 - Q32022 - Q1 <br />Budgeted Costs: <br />Planning/EnvironmentalA&E DesignConstructionProject Management <br />$25,000$18,000$180,000$18,000 <br />Equipment/Miscellaneous Budgeted Project Cost (2017 $)Budgeted Project Cost (Escalated) <br />$0$241,000$266,000 <br />Project Location: <br /> <br /> <br />EUGENE AIRPORT MASTER PLAN 5-48 <br /> <br />