My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPLEMENTATION AND FINANCING PLAN <br />Project Title: <br />Landside Roadway, Parking, and Rental Car Improvements <br />Project Description: <br />Expand terminal loop road, construct roundabout intersection, and expand parking within as demand necessitates. Construct <br />cell phone lot on Northrup Drive. Create new entry to parking lots from Lockheed Drive and construct commercial vehicle <br />staging area near outer curb road. Expand rental car quick-turn around (QTA) service facility. <br />Project Trigger: <br />Parking and rental car facilities are at capacity during highest demand days (holidays and major local events). Safety issues at <br />the current airport entry intersection drive the need for expansion of the loop road as soon as practical. <br />Project Justification: <br />Expansion of the terminal loop road increases space and improves safety by constructing a roundabout which eliminates the <br />existing left-turn loop road entrance against oncoming traffic. The increased loop road perimeter also provides space for <br />needed parking and rental car expansions. The new cell phone lot increases curb road capacity by eliminating unnecessary <br />bypass traffic and long curb dwell times. The new service road for parking and rental car also eliminates curb bypass traffic <br />created by rental car users leaving the airport. The commercial vehicle staging lot creates capacity for staging commercial <br />vehicles. <br />Project Schedule: <br />Procurement StartDesign StartConstruction StartConstruction End <br />2020 - Q12020 - Q22021 - Q22021 - Q4 <br />Budgeted Costs: <br />Planning/EnvironmentalA&E DesignConstructionProject Management <br />$0$333,800$3,338,000$333,800 <br />Equipment/Miscellaneous Budgeted Project Cost (2017 $)Budgeted Project Cost (Escalated) <br />$0$4,005,600$4,407,000 <br />Project Location: <br /> <br /> <br />EUGENE AIRPORT MASTER PLAN 5-49 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.