My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPLEMENTATION AND FINANCING PLAN <br />Project Title: <br />Demolish Old ATCT, Old Landside Equip/Materials Storage, and Friendly Hangar <br />Project Description: <br />Remove buildings to allow space for new commercial terminal expansion and mitigate environmental/health hazards. Asbestos <br />mitigation is required for demolition of old Air Traffic Control Tower (ATCT) building and is programmed in this CIP prior to this <br />project accordingly. <br />Project Trigger: <br />Design of new terminal and concourse expansion begins. <br />Project Justification: <br />This project enables development of the terminal concourse and ticketing expansion. Demolition is required to expand <br />commercial terminal. Both buildings are in poor condition and have exceeded their life span. The old ATCT building poses a <br />continuing environmental health hazard due to the existence of asbestos. Additionally, telecommunication lines have junctions <br />within the building. The Friendly Hangar has reached the end of its useful life and deferred maintenance has rendered it a <br />worthless liability. The condition of these two facilities is such that they cannot be leased or repurposed for tenant usage. These <br />factors will require consideration when the buildings are demolished. <br />Project Schedule: <br />Procurement StartDesign StartConstruction StartConstruction End <br />2021 - Q4--2022 - Q1 <br />Budgeted Costs: <br />Planning/EnvironmentalA&E DesignConstructionProject Management <br />$0$0$296,000$0 <br />Equipment/Miscellaneous Budgeted Project Cost (2017 $)Budgeted Project Cost (Escalated) <br />$0$296,000$333,000 <br />Project Location: <br /> <br /> <br />EUGENE AIRPORT MASTER PLAN 5-53 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.