IMPLEMENTATION AND FINANCING PLAN <br />The following projects are recommended to be included in one EA to determine the potential <br />environmental impacts of the development: <br />1. Taxiway L and Taxiway J Construction <br />2. Rental Car Maintenance Garage <br />3. Taxiway B Reconstruction and Shoulder Paving <br />Potential environmental impacts associated with the projects in this EA can be found in Chapter 7, <br />Environmental Overview. All long-term Environmental Assessments are programmed to be funded <br />through federal AIP entitlement grants and required local matches. <br />56. Taxiway L and Taxiway J Construction <br />Taxiway L and Taxiway J serve the current cargo and charter facilities at the south end of Taxiway A. These <br />two taxiways are not up to current FAA design geometry standard for the airport critical aircraft. Project <br />costs for this airfield project are programmed to receive federal AIP entitlement funds with the required <br />local match. <br />57. Rental Car Maintenance Garage <br />This project constructs a rental car maintenance garage providing rental car agencies with the ability to <br />lease an on-airport maintenance garage allowing these companies the ability to perform heavy <br />maintenance more efficiently. Funding for this facility is recommended to come from CFC funds since the <br />facility will be used directly by the rental car agencies. <br />58. Taxiway B Reconstruction and Shoulder Paving <br />Taxiway B is the parallel taxiway serving the secondary runway which serves commercial operations when <br />the primary runway is unavailable. Current geometry does not meet FAA design guidance and should be <br />brought up to current standards. Paving the shoulders along this taxiway provides enhanced safety during <br />the movement of commercial aircraft along Taxiway B. Funding for this airfield project is programmed to <br />come from federal AIP entitlement funds with the required local match. <br /> Notable Projects Recommended to Occur Beyond the Planning Period <br />Two projects were identified as being important to the development of the Airport, however, <br />implementation planning does not require them within the 20-year planning period. These two projects <br />include the following: <br />» Green Hill Road Relocation Construction <br />» Taxiway M Extension <br />Greenhill Road is a north-south running road located near the eastern edge of the airport property. The <br />road bisects airport property in a way which limits development potential for both aeronautical and non- <br />aeronautical uses. This project recommends relocating that road to the eastern edge of the airport <br />property. Doing so allows more productive land uses to occur onand off airport property, thereby <br />generating revenue for the Airport and improving development opportunities beyond airport boundaries. <br />EUGENE AIRPORT MASTER PLAN 5-66 <br /> <br />