My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2A: Approval of City Council Minutes
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 07/23/07 Meeting
>
Item 2A: Approval of City Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:24:56 PM
Creation date
7/19/2007 10:13:04 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
7/23/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Zelenka observed that HB 2735 would give a five-year property tax assessment value freeze on the <br />manufactured home park land after the closure and asked if that was true regardless of what the property <br />owner did with the property. Mr. Weinman affirmed that it was true. <br /> <br />Mayor Piercy asked how the City of Eugene’s proposals differed from the State legislation. Mr. Weinman <br />replied that local recommendations included a housing counselor. He said the State legislation did not allow <br />rent increases during the period after the park owners had announced a park would close. He related that the <br />State legislation had a somewhat different and lower schedule for paying moving costs. <br /> <br />Ms. Bettman did not believe the SDC credits were included in the ordinance. She surmised that the City <br />Manager would have “broad discretion” to grant those credits. Mr. Lidz responded that there were some <br />state requirements for when those credits should be granted and there were some that were in the SDC <br />methodology. <br /> <br />Ms. Bettman asked if the City would have to take formal steps to amend the SDC methodology to allow <br />such credits. She commented that when speaking of “spreading the pain around,” she assumed someone <br />would close their manufactured home park because they believed they would make more money through <br />another land use. She believed this constituted compensation. She asserted that given that an SDC was <br />charged for capacity, any unpaid costs would be transferred onto the remainder of the community. She <br />asked for clarification as to how the “SDC piece” would be implemented and specified that it be given in <br />writing. <br /> <br />In response to a question from Mayor Piercy, Mr. Weinman pointed out that Attachment B contained <br />specific information on the differences and whether the local ordinance was better than what the State <br />legislation would provide for. <br /> <br />Mr. Clark asked whether the House Bill or Senate Bill was more likely to pass. Mr. Weinman replied that, <br />it was unclear, but the House Bill had passed through committee and was the one with the preemption <br />clause. <br /> <br />City Manager Taylor noted that the item was scheduled for a public hearing on June 18. <br /> <br /> <br />C. WORK SESSION: <br /> <br />Oregon Department of Transportation Presentation on I-5/Willamette River Bridge Project <br /> <br /> <br />City Manager Taylor invited Transportation Planning Engineer for the Public Works Department, Chris <br />Henry, to the table. <br /> <br />Mr. Henry introduced Oregon Department of Transportation (ODOT) staff member, Tim Dodson, and <br />consultant for the project, Lou Krug. He noted that the existing bridge was 45 years old; in a 2002 <br />assessment it had been found to be damaged and the repairs would not be cost effective. <br /> <br />Mr. Dodson provided a power point presentation entitled The OTIA III State Bridge Delivery Program <br />and the Willamette River Bridge, hard copies of which were provided to the council and staff. He <br />reminded the council that the Oregon Transportation Improvement Act (OTIA) III had included $1.3 billion <br />for the repair and replacement of 365 bridges around the State, of which the Willamette River Bridge was <br />one. He said originally the bridge had been scheduled for approximately $70 million but since then it had <br /> <br /> <br />MINUTES—Eugene City Council June 11, 2007 Page 6 <br /> Work Session <br />
The URL can be used to link to this page
Your browser does not support the video tag.