My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2A: Approval of City Council Minutes
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 07/23/07 Meeting
>
Item 2A: Approval of City Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:24:56 PM
Creation date
7/19/2007 10:13:04 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
7/23/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
been increased to $180 million. He added that at this point in time the whole program was in “negative <br />reserve.” <br /> <br />Mr. Dodson recognized the members of the Community Advisory Group who were present, noting that they <br />had been participating in the design process for the bridge and had been very helpful. He reported that <br />ODOT had met with the Laurel Hill Valley Neighborhood, City of Springfield, and the American Institute of <br />Architects. He said they would meet with the County Commissioners later in the week and hoped to meet <br />with the Fairmount Neighbors as well. <br /> <br />Mr. Dodson related that impacts to the environment were of primary interest to the regulators. He stated <br />that the project was in the environmental assessment phase. He explained that as the environmental analysis <br />was conducted, a better idea of the number of piers and the bridge footprint would be known. He said they <br />had identified which bridge types could be afforded by the current budget. He noted that ODOT was <br />planning to procure a Construction Manager/General Contractor (CM/GC), adding that having construction <br />experience interfacing with the design process would bring energy to the design team. He showed slides of <br />the conceptual designs that had been formulated thus far and delineated the differences between them. <br /> <br />In conclusion, Mr. Dodson stated that ODOT was willing to build any bridge but only had $70 million to <br />allocate to it unless additional funds could be brought in. He noted that the $70 million was for the bridge <br />structure alone. He said the project included funding for another $110 million in engineering and other <br />costs, noting that it would cost several million dollars to demolish the existing bridge. <br /> <br />Mayor Piercy commented that the designs responded to the City’s needs but not to its “wishes.” She said it <br />had been hoped that the bridge would be a “signature bridge” and would serve as a gateway to the two <br />communities. She asked what the timeline was for additional funds. Mr. Dodson replied that ODOT would <br />need to know of any significant design changes within six months. <br /> <br />Mayor Piercy asked if any particular comments had been made by members of the public about the design <br />of the bridge. Mr. Dodson responded that some members of the public had voiced support for an arch kind <br />of structure and some had suggested a cabled bridge. Mr. Henry added that the community response had <br />been mixed with regard to bridge types. He stated that the Community Advisory Group had expressed a <br />preference for reducing the environmental impact over esthetics. <br /> <br />Mr. Poling thanked Mr. Dodson and Mr. Krug for the presentation. He said though the Harlow Neighbor- <br />hood Association was not going to be tremendously impacted, it would still appreciate being updated on the <br />project. <br /> <br />Mr. Poling asked if there were plans to expand Franklin Boulevard to seven lanes. Mr. Dodson replied that <br />ODOT had picked a conservative cross-section in order to provide a hole big enough under the bridge to <br />expand the road to the “worst case.” Mr. Henry stressed that neither jurisdiction was advocating for <br />expansion of the road to seven lanes. He said the future scenario for Franklin Boulevard included two lanes <br />in each direction, two EmX lanes, and some additional width. <br /> <br />Mr. Pryor averred that it was worthwhile to balance the transportation needs, environmental needs, and <br />esthetics. He was conscious of the costs and preferred a single span over the river. He expressed a <br />preference for the haunched bridge design. <br /> <br />Ms. Bettman expressed surprise that the collateral projects were more expensive than the bridge itself. She <br />wondered what was included. Mr. Henry responded that the elevation of the roadway to the bridge had to be <br /> <br /> <br />MINUTES—Eugene City Council June 11, 2007 Page 7 <br /> Work Session <br />
The URL can be used to link to this page
Your browser does not support the video tag.