Laserfiche WebLink
FINDnvGS AND RECD ATI4N5 <br /> <br />SUEJECT; PAVIl~G, STORM AND SANITARY SEWERS GN SHERATON DRIVE <br />FRAM CHATEAU MEADG'W DRI~E,1700-FEET NORTH <br />~CaNTRACT ~-lb} <br />BACKGROUND <br />This project was initiated by a petirion from property owners. The properties petitioning for the <br />improvements represent approximately 86~ of the assessable improvement costs to be born by <br />the benefiting properties. <br />Based on the petitions, the City Engineer initiated the project, as provided for in the Eugene <br />Code 7. ~ 60~$~ on March 1, 1990. The property owners were notified of the pending focal <br />improvement distract hearing 10 days prior to the hearing. The local improvement district was <br />authorized on by the Council on June 25, 1990. The low bid was submitted by ~Vildish <br />Corvallis Construction Co, for an amount of $154,902.60. <br />PROJECT <br />The project includes 28-foot paving, curbs, gutters, concrete sidewalks, sanitary and storm <br />sewers, <br />ASSESSMENT <br />Under City of Eugene assessment policy, the majority of the improvement casts will be assessed <br />to the abutting property owners, with the balance born by the City. The costs to be assessed are <br />shown below; <br />25-foot paving $ 4D.141front foot <br />4" sidewalk $ 2.Ollsquare foot <br />Sanitary sewer $ .201square foot <br />Sanitary service $ 319.541each <br />Storm drawn $ .lllsquare foot <br />Costs listed below are the Engineer's estimate and preliminary costs quoted to property owners <br />at the local improvement hearing fallowing bid opening. <br />28-foot paving $ 48.95/front foot <br />4" sidewalk $ 2.12/square foot <br />Sanitary sewer $ .16/square foot <br />_1_ <br />