My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC Minutes - 07/28/08 Meeting
COE
>
City of Eugene
>
Council Minutes
>
2008
>
CC Minutes - 07/28/08 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 10:30:51 AM
Creation date
11/14/2008 2:32:36 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
7/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilor Bettman wanted the bridge design to be adequate to accommodate the reconstruction of the <br />existing ramps, not new ramps. Mr. Dodson pointed out the findings called for reconstruction of the <br />existing ramps. <br /> <br />Chris Henry of the Public Works Department clarified the scope of the project, which did not include ramps <br />at Franklin Boulevard. He said that ODOT’s reference to ramps was to reconstruction of existing ramps to <br />allow it to connect to a new elevation of I-5. <br /> <br />Councilor Pryor expressed appreciation for the work done by ODOT and recalled his earlier support for the <br />deck-arch bridge, although he thought it had safety issues. He thought the deck-arch had the same potential <br />but believed they could be mitigated. He liked the through-arch design as well and indicated it would be his <br />first choice now. <br /> <br />Councilor Clark noted his support for the through-arch design first, followed by the box girder design <br />because of the views they provided to the river. He asked if ODOT had done an analysis of safety concerns <br />as regarded the design. Mr. Dodson thought it was possible to design and secure the bridge in a manner that <br />made it difficult for people to access from the ground. He agreed with Councilor Clark that it was a point of <br />consideration for the bridge design. <br /> <br />The meeting adjourned at 9:56 p.m. <br /> <br />Respectfully submitted, <br /> <br /> <br /> <br />Jon Ruiz <br />City Manager <br /> <br />Recorded by Kimberly Young) <br /> <br /> <br />MINUTES—Eugene City Council July 28, 2008 Page 14 <br /> Meeting <br />
The URL can be used to link to this page
Your browser does not support the video tag.