Laserfiche WebLink
ENGINEER'S REPORT - SHIRLEY STREET <br />February 12, 1991 <br />Page 2 <br />included in the billings far the assessments, <br />The Estates North development will pay the regional SDC as each parcel <br />within the subdivision develops. <br />The source of funding for this project is from assessments of the <br />benef fitting properties. Per EC 7.175 ~ 2 } fib} 5c, the costs for the <br />project will be apportioned on a per square foot basis far the lateral <br />sewer, and an a per each basis far the connection points. In accord- <br />ance with EC 7.7 2 0 ~ 1 } ~ c } the $ 0.0 2 5 per square. f oat for the loco 1 SDC <br />and the regional SDC charge will be included in the billings. - <br />The project includes a street trench patch repair component, normally <br />part of the sanitary lateral casts for projects within the City. 4n <br />May 16, 1990, Lane County Commissioners agreed to pay the cost of <br />street repair in the River Road area south of Beltlin~~fo.r street <br />repair. In October 1991, Lane County Commissioners agreed to bear the <br />paving costs on Shirley Street. Staff of Lane County and the City are <br />working on an intergovermental agreement where by Lane County will pay <br />the street repair component far Shirley Street. The Commissioners have <br />not indicated whether these costs will be borne by Lane County far all <br />work north of the Beltline in Santa Clara. <br />ASSESSMENT CASTS <br />Costs listed below are based on the actual cast for the Shirley Street <br />construction. These costs include an eight-inch equivalent charge for <br />the portion of the Irving Road System adjacent to Shirley ..street. In <br />1985 the Irving Road sanitary system was built to serve annexed proper- <br />ties along Irving. At that time it was identified that all properties <br />along Irving would share in the costs of constructing that sewer. The <br />eight--inch equivalent costs for the Irving system are based on the bid <br />prices received for Shirley Street. <br />The final assessment costs reflect the actual construction costs, a <br />portion of the costs of the Irving Road system, costs for Engineering <br />services, 6 percent administration charges, and short-term financing <br />costs. The lateral price also reflects the developer being assessed <br />directly for a portion of the extra depth of the sewer line in the <br />amount of $17,050 in addition to the lateral costs to Estates North. <br />The additional developer contribution was established during the <br />formation of the LID. <br />Previous to the construction the costs were estimated as follows: <br />Total Assessable Cast: $ 143,714.85 <br />Total Assessable Area: 239,255 square feet <br />Lateral Cost: $ 0.378 per square foot of 160' area** <br />