Laserfiche WebLink
12. Gilham, Northernmost New Collector to Ayres Road <br />Improvement: Upgrade to two lane urban facility with curbs, sidewalks <br />and bicycle lanes from proposed new collector to Ayres Raad. <br />Cost: $230,000 <br />Distance: 1,20o feet <br />Justification: Urban standards, safety <br />Jurisdiction: Eugene and Lane County <br />13. Goadpasture lakes Loop Road <br />Improvement: Construct to urban standards with 3 to 5 lanes and bic - <br />cle lanes. Traffic s' y <br />~gnal controls need to be evaluated for the <br />western intersection with Gaodpasture Island Road . <br />Cost: $»5, oao <br />Distance: 3,404 feet <br />Justification: Access <br />Jurisdiction: Eugene <br />14. Kinsrow, Centennial Boulevard to the east <br />Improvement: Upgrade to a~two or three lane urban facilit with curbs <br />Y <br />sidewalks, and bicycle provisions completed. <br />Cost: $275,000 <br />Distance: I,200 feet <br />Justification: Access, urban standards <br />Jurisdiction: Eugene <br />I5. Leo Harris Loop Road, Centennial Boulevard at Gate Ito Gate 3 or 4. <br />Improvement: Construct a variable two-to-four lane roadwa to urban <br />standards with a y <br />s ~ dewal k on the north side and bicycle lanes . The <br />facility will be located along the south edge of the Autzen Stadium <br />parking 1 ot. <br />Cost: $840,000 <br />Distance: 2,800 feet <br />Justification: Safety, access, urban standards <br />Jurisdiction: Lane County <br />X6. Old Coburg Road, Game Farm Road to Chad Drive. <br />Improvement: Upgrade to a two-or-three <br />sidewalks, and bicycle provisions. <br />Cost: $365,000 <br />Distance: 1,604 feet <br />Justification: Urban standards, safety, <br />Jurisdiction: Eugene <br />lane urban street with curbs, <br />truck traffic <br />-4- <br />