Laserfiche WebLink
J 9888 <br />EXHIBIt B <br />AMENDMENTS TC THE STREET AND HIGHWAY PROJECT LIST <br />1. Gateway and Belt Line Intersection SPRING}: <br />- add a second right-turn lane for eastbound traffic <br />- add aright-thru option lane far southbound traffic <br />cost: $ ~ oo,ooo <br />A roximate Com Ietion Date: Medium Range Phase <br />2. Gateway and Game Farm Road SPRING}: <br />- install a traffic signal <br />cost: $~~o,ooo <br />A roximate Com fetion Date: Long Range Phase <br />3. Pioneer Parkway and Eugene-Springfield Highway, East Bound Off-Ramp tSPRING & <br />oD~T}. <br />- add a second left turn lane for east bound traffic <br />C_. ost: ~~ Oo,ooO <br />Approximate Com fetion Date: Short Range Phase <br />4. Pioneer Parkway and "G" Street Intersection 4SPRING Sc QDDT}: <br />- convert the southbound right turn only Zane to a right-thru option Pane <br />- add a second left turn lane for northbound traffic <br />Cost: $50,000 <br />Approximate Completion Date: Short Range Phase <br />5. Gateway and Oakdale intersection SPRING}: <br />- install a traffic signal <br />Cost,: $ ~ 20,000 <br />A roximate Com fetion Date: Short Range Phase <br />6. International ~IIlay between Game Farm Road North and Deadmond Ferry Road SPRING}: <br />- construct an east-west collector street two to three lanes} as an extension to <br />international Way-an existing city street <br />Cost: $ 900,000 <br />A roximate Com fetion Date: Medium Range Phase <br />7. Game Farm Road North between Game Farm Road East and the 1-5 Cvercrossing 4SPRING <br />& LC}, <br />- upgrade to a three-lane urban facility with sidewalks and bike paths <br />Cost: $450,000 <br />A roximate Cam fetion Date: Medium Range Phase <br />8. Bally View Lane 1SPRING}: <br />- upgrade to urban standards with sidewalks and bike paths, unless determined <br />unnecessary <br />Cost: X338,000 <br />A roximate Com fetion Date: Lang Range Phase <br />~XH18lT <br />PAIGE l ~~' ~ <br />