My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19888
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 19888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:47:29 PM
Creation date
11/18/2008 2:16:38 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19888
Document_Title
An ordinance amending the Eugene-Springfield Metropolitan Area Public Facilities Plan (PFP).
Adopted_Date
11/9/1992
Approved Date
11/9/1992
CMO_Effective_Date
12/9/1992
Repeal_Date
12/10/2001
Signer
Jeffrey R. Miller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J 9888 <br />EXHIBIt B <br />AMENDMENTS TC THE STREET AND HIGHWAY PROJECT LIST <br />1. Gateway and Belt Line Intersection SPRING}: <br />- add a second right-turn lane for eastbound traffic <br />- add aright-thru option lane far southbound traffic <br />cost: $ ~ oo,ooo <br />A roximate Com Ietion Date: Medium Range Phase <br />2. Gateway and Game Farm Road SPRING}: <br />- install a traffic signal <br />cost: $~~o,ooo <br />A roximate Com fetion Date: Long Range Phase <br />3. Pioneer Parkway and Eugene-Springfield Highway, East Bound Off-Ramp tSPRING & <br />oD~T}. <br />- add a second left turn lane for east bound traffic <br />C_. ost: ~~ Oo,ooO <br />Approximate Com fetion Date: Short Range Phase <br />4. Pioneer Parkway and "G" Street Intersection 4SPRING Sc QDDT}: <br />- convert the southbound right turn only Zane to a right-thru option Pane <br />- add a second left turn lane for northbound traffic <br />Cost: $50,000 <br />Approximate Completion Date: Short Range Phase <br />5. Gateway and Oakdale intersection SPRING}: <br />- install a traffic signal <br />Cost,: $ ~ 20,000 <br />A roximate Com fetion Date: Short Range Phase <br />6. International ~IIlay between Game Farm Road North and Deadmond Ferry Road SPRING}: <br />- construct an east-west collector street two to three lanes} as an extension to <br />international Way-an existing city street <br />Cost: $ 900,000 <br />A roximate Com fetion Date: Medium Range Phase <br />7. Game Farm Road North between Game Farm Road East and the 1-5 Cvercrossing 4SPRING <br />& LC}, <br />- upgrade to a three-lane urban facility with sidewalks and bike paths <br />Cost: $450,000 <br />A roximate Cam fetion Date: Medium Range Phase <br />8. Bally View Lane 1SPRING}: <br />- upgrade to urban standards with sidewalks and bike paths, unless determined <br />unnecessary <br />Cost: X338,000 <br />A roximate Com fetion Date: Lang Range Phase <br />~XH18lT <br />PAIGE l ~~' ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.