Laserfiche WebLink
9. Deadmond Ferry Road between Game Farm Road East and the Mckenzie River SPRI • <br />. t NG}. <br />- upgrade to urban standards with sidewalks and bike paths, unless determined <br />unnecessary <br />Cost: ~934,Oa0 <br />A roximate Cam letian Date: Lang Range Phase <br />10. North-South Collector Road tar MDR Site SPRING}: <br />construct anorth-south collector road that will serve the MDR site, including sidewalks <br />and bike paths unless determined unnecessary <br />Cost. S394,Qa0 <br />A roximate Com letian Date: Medium Range Phase <br />11. Pioneer Parkway between Harlow Road and Beltline Road SPRING & CDCT : <br />} <br />- extend Pioneer Parkway north to Belt Line Road or to GameFarm Road South--2 or 4 <br />lanes with landscaped median, including sidewalks and bike aths unless determin <br />p ed <br />unnecessary <br />Cost: $2,20~,a0a <br />A roximate Com letian Date: Long Range Phase <br />12. Belt Line Rvad east of Game Farm Road South SPRING}: <br />- extend Belt Line Road eastward into the MDR site--3 lanes with bike lanes and <br />sidewalks <br />Cost: $439,a0a <br />A roximate Com letian Date: Long Range Phase <br />13. Raleighwood Avenue Extension 4SPRING}: <br />• -extend Raleighwood eastward 4to connect with anorth-south collector for the MDR <br />site}--2-3 lanes with bike paths and sidewalks <br />Cost: $281,000 <br />A roximate Cam letian Date: Medium Range Phase <br />14. Game Farm Road South and Game Farm Road East, from Belt line Road to Gam <br />e Farm <br />Road North SPRING & LC}: <br />• upgrade to a 2-3 lane urban facility <br />- provide curbs, sidewalks and bike lanes <br />C.~ os~: $1,414,400 <br />A roximate Com letian Date: Medium Range Phase <br />EXHIBIT <br />PAGE ~+ pF 3 <br />