My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19920
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 19920
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:47:41 PM
Creation date
11/19/2008 4:08:54 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19920
Document_Title
Ordinance levying assessments for paving, sidewalks, curb & gutters, street lights and storm sewers on Goodpasture Island Rd. 2000-ft.north of Valley River Drive to 425-feet north of Kingsley St.; and declaring an emergency. (Contract 92-26)
Adopted_Date
6/16/1993
Approved Date
6/16/1993
CMO_Effective_Date
6/16/1993
Signer
Ruth Bascom
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINDINGS AND RECOMMEt1iDATIONS <br />SUBJECT: ,PAVING, SIDEWALKS, CURB AND G ,STREET LIGHTS AND <br />STORM SE~f~ERS ON GOODPASTURE LSLAND ROAD 2~-FEET <br />NORTH OF VALLEY RIVER, DRIVE TO 4Z5-FEET NORTH OF <br />KINGSLEY ROAD CONTRACT ~9Z-26} <br />BACKGROUND <br />Gn July 27,1992 the City Council adopted resolution no. 4339 which authorized the forma~on <br />of a Local Improvement District (LID} to improve Goodpasture Island Road from 2000-feet <br />north of Valley River Drive to 425-feet north of Kingsley Road. The project has now been <br />constructed and is ready for assessment to the benefitting property owners. <br />A public hearing concerning the proposed assessments was conducted on June 2, 1993 at 6:00 <br />P, M. in the first floor conference room of City Hall II, Hearings Gfficial Jack A. Billings <br />presided. A copy of Minutes taken during the public hearing are attached to these Findings and <br />Recommendations as Exhibit "1". <br />ASSESSMENT COSTS <br />At the Mme of the formation of the LID, the preliminary costs quoted to property owners were <br />as follows: <br />36-foot paving $56.791frant foot <br />20-foot paving $35.941front foot <br />Sidewalk $12, 081front foot <br />Driveways $ 2, 681square foot <br />A sizeable amount of the benefitting property along this project is owned by the City of Eugene. <br />Under the City's assessment policy, 63 % of the final improvement costs will be distributed to <br />the abutting property owners based upon the costs for the project as follows: <br />36-foot paving $51, 471front foot <br />20-foot paving $31.951front foot <br />Sidewalk $10.0 l lfront foot <br />Driveways $ 3.031square foot <br />The City's share of the costs of the project are as follows: <br />PavinglSidewalkl <br />Lighting $217, 946.07 <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.