Laserfiche WebLink
Protection, Research and Sanctuaries Act or regulations pramul gated <br />by the city manager. <br />Mobile waste hauler. A person who, by contract ar otherwise, <br />collects wastewater, i nc1 udi ng domesti c waste and septage waste, for <br />transportation to and discharge into any portion of the city <br />wastewater system. "Domestic waste" and "septage waste" as used <br />herein have the meaning found in section fi.506. <br />Mobile waste hauler aermi t. A permi t issued pursuant to <br />:~~~• ~ 1 Iii I Ilili~ili~~ <br />section 6.551 of this code. <br />NPDES permit . National Pol 1 ut i on Discharge E1 i mi nati on System <br />permit issued pursuant to ORS 468.140 and the Act. <br />New si ni f i cant industrial user. Any person discharging from <br />any bui 1 di ng, structure, facility or installation source} , the <br />construction of which commenced after the publication of proposed <br />pretreatment standards under section 301 ~c} of the Act which wi 11 be <br />applicable to such source i f such standards are thereafter <br />promulgated i n accordance with that section, provided that: <br />~a} The building, structure, faci 1 i ty ar installation i s <br />constructed at a site at which no other source is located; or <br />fib} The bui 1 di ng, structure, faci 1 i ty or installation <br />totally replaces the process or production equipment that causes the <br />discharge of pol 1 utants at an existing source; or <br />~ c } The production of wastewater generating processes of the <br />building, structure, facility or installation are substantially <br />independent of an existing source at the same site . I n determining <br />whether these are substantially independent, factors such as the <br />extent to which the new facility is integrated with the existing <br />plant, and the extent to which the new faci 1 i ty i s engaged i n the <br />same general type of activity as the existing source should be <br />considered. <br />Construction on a site at which an existing source is located <br />results i n a math f i cati an rather than a new source i f the <br />construction does not create a new bui 1 di ng, structure, faci 1 i ty or <br />instal 1 ati on meeting the criteria of paragraphs fib} or ~c} of thi s <br />paragraph but otherwise alters, replaces, or adds to existing <br />process ar production equipment. Construction of a new source as <br />defined under this paragraph has commenced i f the owner or operator <br />has: <br />~d} Begun, or caused to begin as part of a continuous on- <br />site construction program: <br />1. Any placement, assembly, or installation of <br />facilities or equipment; ar <br />2. Significant site preparation work including <br />clearing, excavation, or removal of existing buildings, <br />structures, or facilities which is necessary far the <br />placement, assembly, or installation of new source facilities <br />or equipment; or <br />fie} Entered i nto a bi ndi ng contractual obligation for the <br />purchase of faci 1 i t i es or equipment which are intended to be used i n <br />its operation within a reasonable time. Options to purchase or <br />contracts which can be terminated ar modified without substantial <br />loss, and contracts for feasibility, engineering, and design studies <br />Ordinance - 4 <br />