My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19962
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 19962
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:48:02 PM
Creation date
11/21/2008 2:03:54 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19962
Document_Title
Authorizing the institution of proceedings in eminent domain for the acquisition of property interests along Terry Street from Royal Avenue to Barger Drive, for the purposes of construction of street improvements; and declaring an emergency.
Adopted_Date
4/11/1994
Approved Date
4/11/1994
CMO_Effective_Date
4/11/1994
Signer
Ruth F. Bascom
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HEARING MEMO - TERRY STREET <br />March 21. 1994 <br />Page 2 <br /> <br />The City 15 proposing: <br /> <br />14 That abutting property owners be assessed on a front footage basis <br />for curbs and gutters. the assessable portion of the pavement <br />width and for any driveway improvements as outline in Chapter 7 of <br />the.Municipal Code. Based on historical project costs, the <br />.estimated assessments are: <br /> <br />20-foot equivalent <br />28-foot equivalent <br />36-foot equivalent <br />44-foot equivalent <br /> <br />$ 65.00/front foot <br />$ 87.50/front foot <br />$109.50/front foot <br />$131.50/front foot <br /> <br />No design work has been performed at this stage of the project <br />development. .50 the estimates provided above may be effected by <br />unknown utility conflicts. sailor topographic constraints etc. <br />Final Costs will be based on actual project costs determined at <br />completion. <br /> <br />The sidewalks will be constructed and assessed to the properties <br />on east side only at this time. Future development requirements <br />on the west side will require sidewalks to be constructed. The <br />estimated assessment is $18 to $21 per front foot 4 <br /> <br />2. That the City will pick up the cost for non-assessable pavement <br />width, non-assessable drainage capacity, intersections and street <br />lighting as identified by City Code. Chapter 7. <br /> <br />STAFF ANALYSIS <br /> <br />The opening of Terry Street to through traffic between Royal Avenue and Barger <br />Drive has been a high priority and listed in the eIP and Transplan as a <br />needed project for several years. As development along Terry Street and <br />through out the neighborhood has occurred. and the future improvements to <br />Beltline Road moves closer. this need has increased. Between Beltline Road <br />and Green Hill Road, Terry Street is the only north-south connector street <br />between Royal Avenue and Barger Drive. <br /> <br />The City has on file. petitions. from property owners. that would bear 57.8% <br />of the assessable cost of Terry Street improvement. Two (2) of the six (6) <br />properties affected by the improvement are in Lane County, and outside the <br />city. Staff is coordinating this improvement with the County. with the City <br />being the responsible for purchase of right-of-way. design. bidding. <br />construction management, assessments and maintenance. The County will be <br />required to approve these two (2) properties being included in the LID per ORS <br />statues. <br />
The URL can be used to link to this page
Your browser does not support the video tag.