Laserfiche WebLink
-,. ~ ~' <br />~.J, <br />Building and the Schaefer Building. Additional design guidelines <br />shall include the Miles report. City of Eugene Historic <br />Preservation staff and SHPO staff shall be involved in bath <br />preliminary and final design for the station to assure <br />compatibility with the nearby historic buildings. Compatibility <br />does not mean an exact match. <br />8. External sidewalk improvements including pavement <br />materials, landscaping and street furniture shall be consistent <br />with street furniture guidelines for the Downtown Mall. <br />9. The transit station shall be constructed to provide <br />rooftop treatment to include the screening of unsightly utilities. <br />olive Plaza will be given the opportunity to participate in and <br />comment on the roof design, and LTD will seriously consider and <br />attempt to address concerns raised by Alive Plaza. <br />D. SECURITY <br />4. The Customer Service Center shall be located on the main <br />boarding platform with visibility to and from the principal <br />passenger and plaza areas. The buildings on the site will include <br />some windows from offices or other staffed areas that face the <br />sidewalks on 11th Avenue and olive Street. <br />5. The exterior of the station shall be well--lit and so <br />designed as to discourage loitering or congregating. <br />Notwithstanding this requirement, LTD may provide for kiosks, <br />seating, and similar amenities in the northwest corner of the site <br />that is identified as the plaza area. <br />6. Add the fallowing sentence to the existing condition: The <br />safety and security report will address security issues for the <br />entire station block, including the adjacent public sidewalk. . <br />F. CONSTRIICTION NOISE/VIBRATION <br />5. Noisiest construction activities shall be limited to hours <br />when the McDonald Theater is not operating, such -as~~~ 7:~~0- a~:m. to <br />3:30 p.m, on weekdays. Measurable limits which should be conducted <br />within this time frame will be submitted by an acoustical engineer <br />and approved by the Planning and Development Department prior to <br />construction. <br />6. Noisy construction activities shall be located the <br />greatest distance possible from the McDonald Theater and Alive <br />Plaza. Noisiest construction activities will be defined by an <br />acoustical engineer prior to. construction. ~ .: ~: ~.~.~..~~~,~~~~ <br />Page 3 -~ Findings of Hearings Qf f icial ~MD 95-18 } <br />G:1wp5~~findings~jan.9b~md-45-~8.d~~ (JUS:ccc) <br />