My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCAgenda-4/12/04Mtg
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-04/12/04Mtg
>
CCAgenda-4/12/04Mtg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:14:02 PM
Creation date
4/9/2004 2:29:43 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda
CMO_Meeting_Date
4/12/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSESSMENT <br /> <br />Based on the low bid received, the costs listed below are the estimated assessment costs plus <br />contingenCy. <br /> <br /> Paving 7- foot (per front foot) $ 74.48 <br /> Paving 10-foot (per front foot) $ 106.39 <br /> Sidewalk (per square foot) $ 3.95 <br /> Wastewater (per square foot) $ 0.30 <br /> Wastewater service (per each) $ 3,650.30 <br /> <br /> Total Assessable Cost $ 927,261.89 <br /> Total City Cost $ 2,790,851.61 <br /> <br /> Total Project Cost $ 3,718,113.50 <br /> <br />The non-assessable City share for this project will be funded primarily from Transportation SDC's, <br />storm water SDC's, and from ODOT. Systems development funds are paid by new development to <br />finance the non-assessable share of this type of improvement project. The nonassessable costs the City <br />will pay for include additional width of paving, intersections, medians, bike lanes, street lights, street <br />trees, traffic signal, and non-assessable storm drainage system costs. In addition, the City is paying for <br />the costs of improvements built through the 1-105 right of way and across the Q-Street Channel. <br /> <br />Properties that are zoned for residential will be assessed for seven (7) feet of pavement width along <br />their frontage. Properties zoned for commercial use will be assessed for ten (10) feet of pavement <br />width. Single family residential properties that are fully developed or vacant but under ½ acre pay for a <br />maximum of 100 feet and a minimum of 50 feet of frontage. Properties that are greater than ½ acre and <br />are partially developed with single family residential will pay for a maximum of 100 feet of frontage at <br />the time of assessment, with the remainder of the frontage assessment being delayed until further <br />development occurs. Vacant properties over ½ acre are not levied an assessment with the LID. <br />Assessment fees will be collected for these vacant properties when they are deVeloped in the future. <br /> <br />Of the assessable cost, $451,106.34 will be delayed street assessments and $223,200.07 will be on-hold <br />wastewater assessments. <br /> <br />Assessment financing, a 1 O-year payment plan through the City, is available to all property owners <br />within the improvement district as identified by City Code, Chapter 7. <br /> <br />LOW INCOME SUBSIDY <br /> <br />Information regarding the subsidy program was mailed by certified mail to property owners of single <br />family and duplex properties in the proposed LID.. Some property responses have been returned and 1 <br />property owner has been granted an extension until April to turn the forms in. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.