My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 4768
COE
>
City of Eugene
>
Resolutions
>
2003 No. 4746-4781
>
Resolution No. 4768
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:48:39 PM
Creation date
10/13/2005 6:29:38 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
7/28/2003
Document_Number
4768
CMO_Effective_Date
7/28/2003
Repeal_Date
5/7/2007
Author
Mary H. Feldman
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5.0 Stormwater System <br /> <br />The stormwater SDC is based upon impervious surface area (e.g., rooftops, <br />driveways, sidewalks, parking lots, patios, and other non-porous surfaces). The <br />detailed formulas for calculating the stormwater SDC unit cost (rate) per square foot <br />of impervious surface area is set forth in Appendix D. The stormwater SDC is <br />determined by multiplying the applicable rate by the unit of measure for the proposed <br />development type. The costs per unit of measure and resulting rates can be found in <br />Table 12 and the fee schedule in Appendix F. <br /> <br />Where the stormwater SDC is a fixed amount per dwelling unit or space, it shall be <br />determined by multiplying the applicable rate per dwelling unit or space times the <br />number of units or spaces plus, for manufactured home park development, the. SDC . <br />is based upon the impervious surface area of all additional common areas times the <br />stormwater unit cost per square foot of impervious surface area. Where the <br />stormwater SDC is not a fixed amount per dwelling unit or space, it shall be <br />determined by multiplying the rate per square foot of impervious surface area times <br />the total impervious surface area of the proposed development. Where a <br />development creates impact not attributable to impervious surface area, the <br />stormwater SDC shall be determined by evaluating equivalent impervious surface <br />area, multiplied by the rate per square foot of impervious surface area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.