My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-22-12-F -- Final ROW Rule R-7.302 and Utility Manual
COE
>
City of Eugene
>
Administrative Orders
>
2022
>
Admin Order 58-22-12-F -- Final ROW Rule R-7.302 and Utility Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2022 10:57:47 AM
Creation date
8/11/2022 10:56:35 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Utility Construction and Use of the Right-of-Way Policies and Procedures Manual Page 8 <br />2.02 Public Way Use Permits for Utilities <br />This permit is only available to Franchised Utilities or licensees who are authorized to install utilities in <br />the City of Eugene Rights-of-Way. All others seeking permits to conduct non-utility related work within <br />the City of Eugene Rights-of-Way should contact the City of Eugene Permit and Information Center staff <br />at 541-682-8400 or by email at CEWEPIC@ci.eugene.or.us to obtain additional information. <br /> <br />2.02.1 Public Way Use Permits - Individual Utility Permit <br />Individual Utility Permits are required, unless otherwise specified in a current Annual Blanket Permit, for <br />an activity that affects the public way and meets any of the following conditions: <br />1. The activity involves the removal, relocation, or modification of the existing facility (e.g. changing <br />the foot line or elevation of underground facilities or moving existing surface or above-ground <br />facilities, poles, or guy lines to a new location). <br />2. The activity involves the cutting of any root 2 inches in diameter or greater of a City-owned street <br />tree, or the cutting of a branch 2 inches in diameter or greater of any City-owned street tree. <br />3. The activity involves installing more linear feet or diameter of pipe, conduit, or cable than is <br />specified in the currently held Annual Blanket Permit. <br />4. The activity includes closing a lane of traffic on a neighborhood collector, major collector, minor <br />or major arterial streets.) Excavation of existing material or placement of fill materials or aggregate <br />in the public way. <br />5. The installation of facilities above or below ground for the purpose of expansion or upgrade. <br />6. The activity involves installing facilities, cable, wire, or lines in an existing conduit installed <br />previously by the utility owner or by another utility or Developer. <br />2.02.2 Utility Permits - Annual Blanket Utility Permit <br />Annual Blanket Utility permits are for the installation of service lines, minor repairs to existing facilities, <br />maintenance functions, and similar recurring activities. An Annual Blanket Permit shall not cover the <br />installation of facilities to expand or upgrade infrastructure beyond the activities specifically addressed in <br />the Utility’s current Blanket Permit. <br /> <br />The Annual Blanket Permit shall include identification of the types of activities and scope of work (length <br />and diameter sizes of service lines, etc.) it authorizes. The Utility shall provide the name and telephone <br />number of a specific "contact person" who will be responsible for responding to City concerns regarding <br />the Utility’s activities. <br /> <br />Before beginning any work within the right of way, Utilities shall provide notice to the City of the location <br />and scope of work which will be performed under the Annual Blanket Permit two business days in advance <br />of the work, unless the work is emergency repair work. Emergency repair work must be reported to the <br />City of Eugene Utility Coordinator staff immediately via email at PWMUtilityPermits@eugene-or.gov <br /> <br />The Utility shall also submit a monthly report of all activities and public way cuts, and each service <br />installation or repair performed by the Utility or the Utility’s contractor. If an activity report has not been
The URL can be used to link to this page
Your browser does not support the video tag.