My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item C: I-5 Franklin Proposed Interchange Project Update
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 11/14/05 WS
>
Item C: I-5 Franklin Proposed Interchange Project Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:19:03 PM
Creation date
11/10/2005 8:18:10 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
11/14/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING/ENVIRONMENTAL AND COST ANALYSIS: <br />I-5 WILLAMETTE RIVER CROSSING/GLENWOOD FACILITY PLAN PHASE II <br />Opportunities for Phased Implementation <br />Ì¿¾´» î ¾»´±© ¾®·»º´§ ¼»½®·¾» ¬¸» ª·¿¾·´·¬§ ±º ½±²¬®«½¬·²¹ »¿½¸ ½±²½»°¬ ·² °¸¿»ô <br />°®·³¿®·´§ ¬± ¿¼¼®» ¬¸» ½±²¬®¿·²¬ ±º ¿ª¿·´¿¾´» º«²¼·²¹ò ɸ·´» °¸¿·²¹ · ¿´± ¿² ±°¬·±² º±® <br />¬¸» °¿®¬·¿´ ·²¬»®½¸¿²¹» ½±²½»°¬ô ±²´§ ¬¸» ±°°±®¬«²·¬·» ¬± °¸¿» ¬¸» º«´´ ·²¬»®½¸¿²¹» <br />½±²½»°¬ ó ©¸·½¸ ¿®» ¹®»¿¬»® ·² »¨¬»²¬ ó ¿®» ®»ª·»©»¼ò ̸· ¼·½«·±² ¿´± ¿«³» ¬¸¿¬ ¬¸» <br />·²¬»®½¸¿²¹» ½±³°±²»²¬ ¬¸¿¬ ¿´´±© ¿½½» º®±³ ¿²¼ ¬± ×óë ²±®¬¸ ±º Ú®¿²µ´·² ©±«´¼ ¾» <br />½±²¬®«½¬»¼ º·®¬ô ·²½» ¬¸» ±«¬¸¾±«²¼ ³±ª»³»²¬ ¿®» ½«®®»²¬´§ °®±ª·¼»¼ ©·¬¸ ¬¸» »¨·¬·²¹ <br />ÑÎ çç ·²¬»®½¸¿²¹» ®¿³°ò <br />߬ ¬¸· ½±²½»°¬«¿´ ´»ª»´ ±º ®»ª·»©ô ¬¸» ¼·½«·±² ±º °¸¿·²¹ ¼±» ²±¬ ¿¼¼®» °±¬»²¬·¿´ <br />·«» ±º »¹³»²¬¿¬·±² ¿²¼ ·²¼»°»²¼»²¬ «¬·´·¬§ º®±³ ¿ ÒÛÐß °»®°»½¬·ª»ò ˲¼»® º»¼»®¿´ <br />®»¹«´¿¬·±²ô ·º °®±¶»½¬ °¸¿» ½¿²²±¬ ¾» º±«²¼ ¬± ¸¿ª» ·²¼»°»²¼»²¬ «¬·´·¬§ º®±³ »¿½¸ ±¬¸»®ô <br />¬¸»² ¬¸» °®±¶»½¬ ©±«´¼ ²±¬ ¾» ¿´´±©»¼ ¬± ¾» ¼»ª»´±°»¼ ·² °¸¿»ò <br />TABLE 2 <br />Phasing Opportunities Summary <br />Category Concept Name Phasing Comments <br />1Full Interchange: <br />For all Category 1 concepts, the northbound on-ramp and southbound <br />Diamond 1off-ramp, along with Franklin Boulevard could be constructed in the first <br />phase. The southbound on-ramp and northbound off-ramp, along with <br />Full Interchange: <br />the removal of the Hwy 99 ramps, could be constructed as a future <br />Diamond 2 <br />* <br />phase. <br />Full Interchange: <br />Partial Cloverleaf <br />2Partial Interchange: Partial interchange - no phasing considered <br />Partial Diamond <br />Partial Interchange: <br />Partial Cloverleaf <br />3 <br />Split Interchange: Two As with the Category 1 concepts, the ramps north of Franklin could be <br />½ Diamonds constructed first. The interchange improvements at Glenwood would <br />* <br />require reconstructing existing ramps with movements that already exist. <br />Split Interchange: <br />Connected Diamonds With the Connected Diamonds concept, a third phase of constructing the <br />collector/distributor roads between Franklin and Glenwood would be an <br />option.* <br />4Glenwood Interchange This concept could be constructed in phases, with the construction of a <br />Diamond new overpass and new southbound off-ramp and northbound on-ramps <br />constructed in the first phase, followed by the remaining ramps in a <br />* <br />second phase. <br />* <br /> This assumes that the proposed phase would have independent utility under federal regulations. <br />PDX\052200014 7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.