My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 53-22-09-F -- Final MUPTE Rule Amendment)
COE
>
City of Eugene
>
Administrative Orders
>
2022
>
Admin Order 53-22-09-F -- Final MUPTE Rule Amendment)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 4:42:03 PM
Creation date
1/19/2023 4:41:44 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Administrative Order - Page 5 of 12 <br />1.2.2.2 City of Eugene Building and Permit Services review of <br />project. Model building energy performance, utilizing the LEED for Homes <br />Midrise energy modeling methodology, showing the building performs <br />10% above current OEESC performance, construct to modeled plans, <br />provide a commissioning report within 18 months following issuance of <br />certificate of occupancy, and work with the City to report multi-family <br />occupancy energy use data to the City for the life of the MUPTE tax <br />exemption. <br /> <br />Table 1.2: MUPTE Energy Performance Pathways <br /> <br />Pathway Building Size <br />1-3 Stories >3 Stories <br />LEED v4 for <br />Homes <br />Low-Rise: Certified + modeled <br />at 10% above OEESC <br />Mid-Rise: Certified + modeled at <br />10% above OEESC <br />Earth Advantage Multifamily: Certified + <br />commissioning report <br />N/A <br />City of Eugene BPS N/A Model at 10% above OEESC + <br />commissioning report <br /> <br />1.3 Local Economic Impact Plan. In order to ensure that a substantial portion <br />of the local tax benefit yields a benefit to the local community, applicant shall submit a <br />Local Economic Impact Plan (Impact Plan), which shall include at least the following <br />elements: <br /> <br />1.3.1 Demonstrate that more than 50% of the dollar volume of the <br />combined professional services and construction contracts are or will be from local <br />firms, as that term is defined in this Rule. <br /> <br />1.3.1.1 Materials are excluded from the dollar volume calculation. <br /> <br />1.3.1.2 Where applicant can provide evidence that a trade is not <br />available locally, payment for services attributed to that trade may be <br />excluded from the dollar volume calculation. <br /> <br />1.3.2 Ensure qualified minority and women business enterprises have an <br />equitable opportunity to compete. At a minimum, the Impact Plan shall <br />demonstrate the following: <br /> <br />1.3.2.1 Developer shall access lists of certified minority, women, <br />emerging small business or disadvantaged business enterprises from the <br />Oregon State Office of Minority, Women and Emerging Small Business.
The URL can be used to link to this page
Your browser does not support the video tag.