My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 44-23-01-F -- Final Public Contracting Rule 2022
COE
>
City of Eugene
>
Administrative Orders
>
2023
>
Admin Order 44-23-01-F -- Final Public Contracting Rule 2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 3:13:40 PM
Creation date
3/7/2023 8:48:00 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/6/2023
Document_Number
44-23-01-F
CMO_Effective_Date
3/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A to Administrative Order No. 44-23-01-F <br />City of Eugene Public Contracting Rules 2022 – Part 2 Page 111 <br /> <br />are the focus of the project. Maintenance services are not Energy Conservation Measures, <br />for purposes of these 137-049-0600 to 137-049-0690 Rules. <br />9) Energy Savings Guarantee means the energy savings and performance guarantee provided <br />by the ESCO under an ESPC Procurement, which guarantees to the Contracting Agency <br />that certain energy savings and performance will be achieved for the project covered by the <br />RFP, through the installation and implementation of the agreed-upon ECMs for the project. <br />The Energy Savings Guarantee shall include, but shall not be limited to, the specific energy <br />savings and performance levels and amounts that will be guaranteed, provisions related to <br />the financial remedies available to the Contracting Agency in the event the guaranteed <br />savings and performance are not achieved, the specific conditions under which the ESCO <br />will guarantee energy savings and performance (including the specific responsibilities of the <br />Contracting Agency after final completion of the design and construction phase), and the <br />term of the energy savings and performance guarantee. <br />10) Energy Savings Performance Contract (or "ESPC") means a Public Improvement Contract <br />between a Contracting Agency and a Qualified Energy Service Company for the <br />identification, evaluation, recommendation, design, and construction of Energy Conservation <br />Measures, including a Design-Build Contract, that guarantee energy savings or <br />performance. <br />11) General Conditions Work (or “GC Work”) means a general grouping of project Work required <br />to support construction operations on the project that is not included within the Contractor’s <br />overhead or fee. <br />12) Guaranteed Maximum Price (or "GMP") has the meaning set forth in ORS 279C.332(4), <br />pertaining to procurements for CM/GC Services. For Alternative Contracting Methods other <br />than the CM/GC Method, “Guaranteed Maximum Price” or “GMP” means the total maximum <br />price provided to the Contracting Agency by the Contractor and accepted by the Contracting <br />Agency that includes all reimbursable costs and fees for completion of the Contract Work <br />and any particularly identified contingency amounts, as defined by the Public Improvement <br />Contract. <br />13) Measurement and Verification (or "M & V") means, as used in ESPC Procurement, the <br />examination of installed ECMs using the International Performance Measurement and <br />Verification Protocol ("IPMVP"), or any other comparable protocol or process, to monitor and <br />verify the operation of energy-using systems pre-installation and post-installation. <br />14) Project Development Plan means a secondary phase of Personal Services and Work <br />performed by an ESCO in an ESPC Procurement when the ESCO performs more extensive <br />design of the agreed-upon ECMs for the project, provides the detailed provisions of the <br />ESCO's Energy Savings Guarantee that the fully installed and commissioned ECMs will <br />achieve a particular energy savings level for the building or structure, and prepares an <br />overall report or plan summarizing the ESCO's Work during this secondary phase of the <br />Work and otherwise explaining how the agreed-upon ECMs will be implemented during the <br />design and construction phase of the Work; The term "Project Development Plan" can also <br />refer to the report or plan provided by the ESCO at the conclusion of this phase of the Work. <br />15) Qualified Energy Service Company (or "ESCO") means, as used in ESPC Procurement, a <br />company, firm, or other legal Person with the following characteristics: demonstrated <br />technical, operational, financial, and managerial capabilities to design, install, construct, <br />commission, manage, measure and verify, and otherwise implement Energy Conservation <br />Measures and other Work on building systems or building components that are directly <br />related to the ECMs in existing buildings and structures; a prior record of successfully <br />performing ESPCs on projects involving existing buildings and structures that are <br />comparable to the project under consideration by the Contracting Agency; and the financial <br />strength to effectively guarantee energy savings and performance under the ESPC for the
The URL can be used to link to this page
Your browser does not support the video tag.