Laserfiche WebLink
Exhibit A to Administrative Order No. 44-23-01-F <br />City of Eugene Public Contracting Rules 2022 – Part 2 Page 69 <br /> <br />including the number of hours proposed for the services required, expenses, <br />hourly rates, and overhead; and <br />(xv) Any other criteria that the Contracting Agency deems relevant to the <br />Project and the Architectural, Engineering, Photogrammetric Mapping, <br />Transportation Planning, or Land Surveying Services, or Related Services <br />described in the RFP, including, where the nature and budget of the Project so <br />warrant, a design competition between competing Proposers. Provided, however, <br />these additional criteria cannot include pricing policies, pricing Proposals or other <br />pricing information, including the number of hours proposed for the services <br />required, expenses, hourly rates, and overhead, when the sole purpose or <br />predominant purpose of the RFP is to obtain Architectural, Engineering, <br />Photogrammetric Mapping, Transportation Planning, or Land Surveying Services. <br />C) Conditions or limitations, if any, that may constrain or prohibit the selected <br />Consultant’s ability to provide additional services related to the Project, including but <br />not limited to construction services; <br />D) Whether interviews are possible and if so, the weight, points or other classifications <br />applicable to the potential interview; <br />E) The date and time Proposals are due, and the delivery location for Proposals; <br />F) Reservation of the right to seek clarifications of each Proposal; <br />G) Reservation of the right to negotiate a final Contract that is in the best interest of the <br />Contracting Agency; <br />H) Reservation of the right to reject any or all Proposals and reservation of the right to <br />cancel the RFP at any time if doing either would be in the public interest as <br />determined by the Contracting Agency; <br />I) A Statement that Proposers responding to the RFP do so solely at their expense, <br />and Contracting Agency is not responsible for any Proposer expenses associated <br />with the RFP; <br />J) A statement directing Proposers to the protest procedures set forth in these division <br />48 rules; <br />K) Special Contract requirements, including but not limited to DBE, MBE, WBE, ESB <br />and SDVB participation goals or good faith efforts with respect to DBE, MBE, WBE, <br />ESB and SDVB participation, and federal requirements when federal funds are <br />involved; <br />L) A statement whether or not the Contracting Agency will hold a pre-Proposal meeting <br />for all interested Consultants to discuss the Project and the Architectural, <br />Engineering, Photogrammetric Mapping, Transportation Planning, or Land Surveying <br />Services, or Related Services described in the RFP and if a pre-Proposal meeting <br />will be held, the location of the meeting and whether or not attendance is mandatory; <br />M) A request for any information the Contracting Agency deems reasonably necessary <br />to permit the Contracting Agency to evaluate, rank and select the most qualified <br />Proposer to perform the Architectural, Engineering, Photogrammetric Mapping, <br />Transportation Planning, or Land Surveying Services, or Related Services described <br />in the RFP; and <br />N) A sample form of the Contract. <br />b) RFP Contents for Related Services Selections Based on Price Only. Contracting <br />Agencies using the formal selection procedure shall include at least the following in each <br />RFP, whether or not the RFP is preceded by an RFQ, when the formal selection <br />procedure is for Related Services selected on the basis of price Proposals and other <br />pricing information only: <br />A) General background information, including a description of the Project and the specific