My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20425
COE
>
City of Eugene
>
Ordinances
>
2008 No. 20401-20425
>
Ordinance No. 20425
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:50:46 PM
Creation date
12/10/2008 11:28:10 AM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20425
Document_Title
Levying assessments for concrete alley paving & constructing wastewater and stormwater systems on 6th Alley between Tyler & Polk streets; providing immediate effective date
Adopted_Date
12/8/2008
Approved Date
12/10/2008
CMO_Effective_Date
12/10/2008
Signer
Kitty Piercy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LOW INCOME SUBSIDY <br /> <br />One potential residential property owner was notified of the Low-to-Moderate Income Street <br />Improvement Subsidy project. The subsidy program is available to property owners who occupy a <br />single family dwelling or duplex and meet other program criteria. Fact sheets which describe the <br />household size and income levels for the subsidy program which is based on the current Lane County <br />Median Family Income. This property owner was given until October 15, 2008 to return their <br />application forms to determine eligibility. This one property has indicated they do not qualify for the <br />program. <br /> <br />RECOMMENDATION <br /> <br />Assessment costs are calculated in accordance with Eugene Code. Staff recommends approval of the <br />final assessments as calculated, and that the Council levy the final assessment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.