Laserfiche WebLink
HEARING MEMG ~ SIDEWALKS . <br />November 13,1996 ~ . <br />Page ~ <br />ASSESSMENT <br />Under City of Eugene assessment policy, 81.2 percent of the improvement costs will be distributed <br />to the abutting property owner. Below are the final unit assessable costs. ~~ <br />4 inch thick concrete sidewalk $ 6.18 iSq. Ft. <br />5 inch thick concrete sidewalk $ 6.911Sq. Ft. <br />l inch thick concrete sidewalk $ ?.1 SISq. Ft. <br />Cost to City: $15, 312, 99 . <br />For: City Ramps at intersections ~ . <br />Extra width ~2'} for l toot residential sidewalks <br />The assessable unit costs listed below are based on the low bids received prior tv construction and <br />were quoted to property owners at the i_!l] hearing fallowing the bid opening: <br />4 inch thick cancrete sidewalk $ 6.911Sq. Ft. <br />5 inch thick concrete sidewalk $ 1.121Sq. Ft. <br />l inch thick concrete sidewalk $ 8.1?ISq. Ft. <br />City Cost: $ 4,829.01 <br />. RECGMMENDATIC~N <br />The final improvement costs are lower than quoted a# the local improvement hearing and are <br />comparable to projects of similar size. Staff recommends approval of the assessment as calculated <br />and that the Council levy the final assessment, <br />e;~SUppartlproj-9513375hrg.m <br />